July 1, 2009 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 26: | Line 26: | ||
* TI board is under testing, 87% live for 2kHz empty readout, need to improve, Sergey does time profiling | * TI board is under testing, 87% live for 2kHz empty readout, need to improve, Sergey does time profiling | ||
* BONUS card need to be tested, will ask Dave Abbott to help | * BONUS card need to be tested, will ask Dave Abbott to help | ||
3. Inventory database: need coordinates (position from top and size in inches and U-s); main page search does descriptions only, need to search all fields |
Revision as of 10:05, 1 July 2009
present: Sergey Boyarinov, Sergey Pozdnyakov, Chris Cuevas, Stepan Stepanyan
1.СLAS12 trigger: following equipment needed for the CLAS12 trigger system:
- CTP (Crate Trigger Processor): 19+1
- TI (Trigger Interface): 20+1
- SD (signal distribution module): 19+1
- TD (trigger distr): 3+1
- SSP (Subsystem processor): 6+1
- Fanout (or SSP): 1
- GTP (Global Trigger processor): 2+1
- ADB backplanes: 18+1 -> $1163*19=$22097
- MUX boards: 252+3 -> $741*255=$188955
- TS (trigger supervisor): 1+1
- VXS crate: 2+1 (18 crates are included into FADC system)
- cables etc
Optional equipment:
- SFP (segment finder processor): 18+1 -> $1640*19=$31160
- RFP (road finder processor): 6+1 (can be combined with SSP - to be decided)
Updated documents will be prepared by Sergey B. before July 8 workshop.
4 lines for FADC
2. BONUS preparations:
- TI board is under testing, 87% live for 2kHz empty readout, need to improve, Sergey does time profiling
- BONUS card need to be tested, will ask Dave Abbott to help
3. Inventory database: need coordinates (position from top and size in inches and U-s); main page search does descriptions only, need to search all fields