July 1, 2009 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
Boiarino (talk | contribs)
No edit summary
Boiarino (talk | contribs)
No edit summary
Line 1: Line 1:
present:  
present: Sergey Boyarinov, Sergey Pozdnyakov, Chris Cuevas, Stepan Stepanyan


1.СLAS12 trigger: following equipment needed for the CLAS12 trigger system:
1.СLAS12 trigger: following equipment needed for the CLAS12 trigger system:

Revision as of 09:35, 1 July 2009

present: Sergey Boyarinov, Sergey Pozdnyakov, Chris Cuevas, Stepan Stepanyan

1.СLAS12 trigger: following equipment needed for the CLAS12 trigger system:

  • CTP (Crate Trigger Processor): 19+1
  • TI (Trigger Interface): 20+1
  • SD (signal distribution module): 19+1
  • TD (trigger distr): 3+1
  • SSP (Subsystem processor): 6+1
  • Fanout (or SSP): 1
  • GTP (Global Trigger processor): 2+1
  • ADB backplanes: 18+1 -> $1163*19=$22097
  • MUX boards: 252+3 -> $741*255=$188955
  • TS (trigger supervisor): 1+1
  • VXS crate: 2+1 (18 crates are included into FADC system)
  • cables etc

.... Optional equipment:

  • SFP (segment finder processor): 18+1 -> $1640*19=$31160
  • RFP (road finder processor): 6+1 (can be combined with SSP - to be decided)

Updated documents will be prepared by Sergey B. before July 8 workshop.

4 lines for FADC