* SSP (Subsystem processor): 6+1
* SSP (Subsystem processor): 6+1
* GTP (Global Trigger processor): 1+1
* GTP (Global Trigger processor): 1+1
* ADB backplanes: 18+1
* ADB backplanes: 18+1 -> $1163*19=$22097
* MUX boards: 252+3
* MUX boards: 252+3 -> $741*255=$188955
* VXS crate: 1+1 (18 crates are included into FADC system)
* VXS crate: 1+1 (18 crates are included into FADC system)
....
....
Optional equipment:
Optional equipment:
* SFP (segment finder processor): 18+1
* SFP (segment finder processor): 18+1 -> $1640*19=$31160
* RFP (road finder processor): 6+1 (can be combined with SSP - to be decided)
* RFP (road finder processor): 6+1 (can be combined with SSP - to be decided)


Updated documents will be prepared by Sergey B. before July 8 workshop.
Updated documents will be prepared by Sergey B. before July 8 workshop.

Revision as of 22:14, 30 June 2009

present:

1.СLAS12 trigger: following equipment needed for the CLAS12 trigger system:

  • CTP (Crate Trigger Processor): 19+1
  • TI (Trigger Interface): 19+1
  • signal distribution module: 19+1
  • SSP (Subsystem processor): 6+1
  • GTP (Global Trigger processor): 1+1
  • ADB backplanes: 18+1 -> $1163*19=$22097
  • MUX boards: 252+3 -> $741*255=$188955
  • VXS crate: 1+1 (18 crates are included into FADC system)

.... Optional equipment:

  • SFP (segment finder processor): 18+1 -> $1640*19=$31160
  • RFP (road finder processor): 6+1 (can be combined with SSP - to be decided)

Updated documents will be prepared by Sergey B. before July 8 workshop.