* bethsw1 lost 3 (at least) ports, power recycle helped; all 3 were connected to terminal servers
* bethsw1 lost 3 (at least) ports, power recycle helped; all 3 were connected to terminal servers


* event rate 5-6 kHz and fluctuates because of rastering
* event rate 5-6 kHz and fluctuates because of rastering; dead time about 10%


* raster is in data stream (FBPM), will be in epics; daq has alarm on raster on/off (clon_pr)
* raster is in data stream (FBPM), will be in epics; daq has alarm on raster on/off (clon_pr)
* new raid->stage->silo mechanism works fine, sometimes staging area unautomount itself, need to have
designated staging area for 3 Halls DAQ systems, problem reported to CC





Revision as of 11:19, 18 February 2009

present: Sergey Boyarinov, Sergey Pozdnyakov, Nerses Gevorgyan

1. eg2dvcs run status

  • clon10 68 subnet (bge1) port broke, 68 was moved to bge2, 69 was removed; will reboot and contact SUN if necessary;

v1190 reflashed

  • new BIGIRON installed, Greg reported sone scan-related problems, clonpc3 will be used to debug
  • mv6100 BSP had a 'bug': DMA was finishing with interrupts, it cause sc2 crashes on high rate; was commented out

on Dave's advise and it works now

  • bethsw1 lost 3 (at least) ports, power recycle helped; all 3 were connected to terminal servers
  • event rate 5-6 kHz and fluctuates because of rastering; dead time about 10%
  • raster is in data stream (FBPM), will be in epics; daq has alarm on raster on/off (clon_pr)
  • new raid->stage->silo mechanism works fine, sometimes staging area unautomount itself, need to have

designated staging area for 3 Halls DAQ systems, problem reported to CC


2. Projects

  • classc5 running new epics, classc12 to do including minitorus power supply control over serial line
  • Lecroy HV mainframes: 3 came from repair, 2 works, 1 to be tested
  • Lecroy HV modules: have enough spares, and the number of broken, but will not repair unless necessary
  • CEAN SY1527: HVDVCS in CAEN, repair under way; HVEC2 drawer in CAEN, under way; SY1527 from Yuri with one module turning itself off occasionally, to be inverstigated
  • A1535 connectors: parts sent to 'Radiall' for investigation, waiting ...; in a meanwhile we have trips in HVEC1, probably related to bad connectors, but it is still unclear ...
  • software IOC cannot restore connection if lost and restored (clonpc2<->HVEC1), showing old values - MUST BE FIXED
  • DCHV in EPICS: mainframe 1 and 4 does not turned off by 'dchv', maybe unused channels - must check; 'dccntrl' need to be added to GUIs
  • 2 str7201 came from repair, need to be checked
  • TOF laser still a troubled system ...