present: Sergey Boyarinov, | present: Sergey Boyarinov, Chris Cuevas, Sergey Pozdnyakov, Nerses Gevorgyan | ||
1. CLAS12 | 1. CLAS12 | ||
* discr | * discr: see [[JLAB Discriminators]] | ||
* DC - SF decks 1 and 3; 18 ADB crates, 10 FASTBUS crates | * DC - SF decks 1 and 3; 18 ADB crates, 10 FASTBUS crates | ||
Line 11: | Line 11: | ||
2. eg1-dvcs | 2. eg1-dvcs | ||
* | * UVC want more money for Lecroy HV repair - will pay; we have 5 mainframes in repair right now, 2 bad in counting house; one SY1527 in repair, will send one by one; took one form Yuri, installed as HVEC2; SY527 will be upgraded(caenet upgrade), waiting for RMA | ||
* | * 1881M ADC for FBPM was installed in DC11, need to check if all wires are connected, and check GATE timing (is TDC stop good enough) | ||
. | * DC EPICS support is finished, under testing; will add DC to standard GUIs; Sergey B. will meet with Vardan and DC experts to make sure everything is correct; both EPICS and DCHV should work in parallel | ||
* clon01 OS was reinstalled (Solaris 10 Update 6) and patched, need to check all EPICS functionality; clonpc2 epics login need check |
Latest revision as of 11:35, 28 January 2009
present: Sergey Boyarinov, Chris Cuevas, Sergey Pozdnyakov, Nerses Gevorgyan
1. CLAS12
- discr: see JLAB Discriminators
- DC - SF decks 1 and 3; 18 ADB crates, 10 FASTBUS crates
- CAEN HV connectors - still under investigation by Sergey P. and Armen; will ask CAEN and connector manufacturer for advice; in a meanwile, new patch panels can be produces without puting multipin connectors; need 8 24-pin patch panels
2. eg1-dvcs
- UVC want more money for Lecroy HV repair - will pay; we have 5 mainframes in repair right now, 2 bad in counting house; one SY1527 in repair, will send one by one; took one form Yuri, installed as HVEC2; SY527 will be upgraded(caenet upgrade), waiting for RMA
- 1881M ADC for FBPM was installed in DC11, need to check if all wires are connected, and check GATE timing (is TDC stop good enough)
- DC EPICS support is finished, under testing; will add DC to standard GUIs; Sergey B. will meet with Vardan and DC experts to make sure everything is correct; both EPICS and DCHV should work in parallel
- clon01 OS was reinstalled (Solaris 10 Update 6) and patched, need to check all EPICS functionality; clonpc2 epics login need check