Schedule: Ben may start in 2 weeks, will ask Chris if it is possible; we'll finilize our requirements during those 2 weeks;
Schedule: Ben may start in 2 weeks, will ask Chris if it is possible; we'll finilize our requirements during those 2 weeks;
system must be ready by the end of August
system must be ready by the end of August; old CLAS L1 trigger logic can be removed if reproduced in new system without losing and functionality

Revision as of 10:32, 2 July 2008

present: Sergey Boyarinov, Pawel Turinski, Hovanes, Stepan, Sergey, Ben, Valery

1. one e in CLAS (ECxCC)

2. one pi0 (2 gammas) DVCS 2 clusters standalone

3. neutral trigger (2., or one in IC, one in CLAS)

4. one e in DVCS x Hodoscope [x something in CLAS, if rate too high]

Logic:

IC: gamma (IC only, or HbarxIC)

     e (IC only, or HxIC)
     multiplicity (one cluster, two clusters, ... - need more outputs)
     cluster identification algorithm (central tower, 3x3 window with any number of towers etc)

EC: gamma (EC mip)

     gamma(EC) x gamma(EC) (2 sectors)
     e (ECmipxCC)
     h+- (ECmipxTOF)

IC threshold will be 300-500MeVas ADC value, we'll have discriminators so it will be amplitude, not charge

Q: how far lvds signal can be send ? we need at least 4 outputs from HxIC logic (2 for ICxH and 2 for IC)

Q: do we need HbarxIC ?

Q: cluster finding algorithm in IC (high thres and one tower, or low thres and cluster ?)

Q: trigger timing ?????


Schedule: Ben may start in 2 weeks, will ask Chris if it is possible; we'll finilize our requirements during those 2 weeks; system must be ready by the end of August; old CLAS L1 trigger logic can be removed if reproduced in new system without losing and functionality