Line 13: Line 13:
* finish inventory database (tag numbers, serial numbers)
* finish inventory database (tag numbers, serial numbers)


* FC level1 rearrangement: need a rack/crate layout !!!sector-based layout including level0 looks interesting, will discuss on Friday upgrade meeting; leve1 south will be shifted one rack left, CC gas must be moved and the rest from the right rack must be removed; TOF pretrigger discr replacement can be considered because of new trigger OR modules makes no difference, JLAB discriminators can be useful to save on scalers
* FC level1 rearrangement: need a rack/crate layout !!!sector-based layout including level0 looks interesting, will discuss on Friday upgrade meeting; leve1 south will be shifted one rack left, CC gas must be moved and the rest from the right rack must be removed cleaning up tof laser electronics; TOF pretrigger discr replacement can be considered because of new trigger OR modules makes no difference, JLAB discriminators can be useful to save on scalers


* deside about new trigger for electron runs; make DVCS trigger (new electronics needed); order flat cables/connectors;
* deside about new trigger for electron runs; make DVCS trigger (new electronics needed); order flat cables/connectors;

Revision as of 10:06, 4 June 2008

present: Sergey Boyarinov, Sergey Pozdnyakov

1. G12 almost over; printer was broken, RC John Price pushed CC to install temporary one, need new printer; CODA problems still the same: msql diamon, tage* crashes, EB must be restarted - Sergey is studying

2. Summer plans:

  • FASTBUS supply upgrade
  • new printer
  • CLAS CODA: new release, devel area will have mysql instead of msql (if exist on vxworks), new diagnostics and tests, CC scan monitoring (block 71 subnet ?)
  • finish inventory database (tag numbers, serial numbers)
  • FC level1 rearrangement: need a rack/crate layout !!!sector-based layout including level0 looks interesting, will discuss on Friday upgrade meeting; leve1 south will be shifted one rack left, CC gas must be moved and the rest from the right rack must be removed cleaning up tof laser electronics; TOF pretrigger discr replacement can be considered because of new trigger OR modules makes no difference, JLAB discriminators can be useful to save on scalers
  • deside about new trigger for electron runs; make DVCS trigger (new electronics needed); order flat cables/connectors;