Boiarino (talk | contribs)
No edit summary
Boiarino (talk | contribs)
No edit summary
Line 19: Line 19:
- even after MCC fixes RF signal was not good, one channel was bad at RF board, another channel was noisy because of discriminator problem. RF board was fixed, second signal was plugged to another discriminator's channel, will fix translation table, then replace discriminator later.
- even after MCC fixes RF signal was not good, one channel was bad at RF board, another channel was noisy because of discriminator problem. RF board was fixed, second signal was plugged to another discriminator's channel, will fix translation table, then replace discriminator later.


- L2 works, no bad segment collectors yet
- L2 works, no bad segment collectors observed so far




3. Projects  
3. Projects  


- fastbus power arrived
- 8 fastbus power supplies arrived from WIENER; Chris's group will make necessary cables and installation during next big downtime, most likely February-March


- clonmon, root_server
- clonmon, root_server

Revision as of 22:18, 17 December 2007

present: Sergey Boyarinov, Sergey Pozdnyakov, Hovanes Egiyan, Nerses Gevorgyan, Stephen Bueltmann, Stepan Stepanyan, Eugene Pasyuk

1. BONUS RTPC DAQ

BONUS DAQ was discussed. We'll consider fiber optic controller instead of USB one, new receiving card will be in PCI-X format. We need to buy electronics from TPC group and ALICE DAQ group. PCI card will come with Linux driver, we need to provide optical signals (trigger etc) and probably slow control over Ethernet.

We have one more USB option now: David Abbot is testing new Intel-based VME controller with USB port; if FC is not available, we can try to use old USB readout, but firmware must be fixed, it is in progress at CERN (U2F).

TI card in PCI format is under development in Fast Electronics group, Sergey will ask status occationally.

We need to know how fast PCI-based fiber optic readut can run, cannot say in advance. We'll buy minimum set necessary to measure readout speed, Stephen will find out about purchases. We may talk to CERN people about software.

Preliminary schedule for testing: May 2008.

2. g9a status

- Moller problem was fixed, MCC fixed their signals. We need better RF monitoring (9 Hz vs 15Hz etc), need data monitoring (non-standard intervals, missing pulses etc).

- even after MCC fixes RF signal was not good, one channel was bad at RF board, another channel was noisy because of discriminator problem. RF board was fixed, second signal was plugged to another discriminator's channel, will fix translation table, then replace discriminator later.

- L2 works, no bad segment collectors observed so far


3. Projects

- 8 fastbus power supplies arrived from WIENER; Chris's group will make necessary cables and installation during next big downtime, most likely February-March

- clonmon, root_server

- new clon10, old clon10 to ELL

- PCAL prototype: move device in a week to the Hall, will connect using DVCS cables, need 16ch scaler and trigger from PS

- CLAS12 trigger

- inventory DB, need convenient frontend