present: Sergey Boyarinov, Eugene Pasyuk, Sergey Pozdnyakov, Nerses Gevorgyan
present: Sergey Boyarinov, Eugene Pasyuk, Sergey Pozdnyakov, Nerses Gevorgyan, Stepan Stepanyan


'''mainframes''':
'''mainframes''':
Line 7: Line 7:
* 6-ch HV boards arrived from repair, works, installed instead of 12-ch (beam line devices)
* 6-ch HV boards arrived from repair, works, installed instead of 12-ch (beam line devices)


* patch panels for new 48-ch HV boards are in progress (Armen)
* suspicious mainframe in tagger area (PS, ST, ...) - Eugene will look at, may redistribute cards to other mainframes including new sy1527


'''epics''':
'''epics''':

Revision as of 09:11, 24 October 2007

present: Sergey Boyarinov, Eugene Pasyuk, Sergey Pozdnyakov, Nerses Gevorgyan, Stepan Stepanyan

mainframes:

  • one Lecroy arrived from repair, under testing in the test setup, works so far; Lei will install it instead of EC #4, which will be tested in test setup and decision will be made on possible repair
  • 6-ch HV boards arrived from repair, works, installed instead of 12-ch (beam line devices)
  • patch panels for new 48-ch HV boards are in progress (Armen)
  • suspicious mainframe in tagger area (PS, ST, ...) - Eugene will look at, may redistribute cards to other mainframes including new sy1527

epics:

  • Nerses if making preparations in epics to switch to the sy1527 from Lecroy if needed
  • some problems were observed related to the bigsubRecord implementation, works now but need to be understood
  • Hallsystems works for LAC, incorporated into ioc restart GUI, still need UNIX version
  • alarm screens - works now ?


fast reconstruction:

  • Franz made several G9A-specific histograms
  • need to fix photon run particle ID part - Sergey is working (it was used to the long time to reconstruct electrons only)


other:

  • counting house cleanup was performed, exsessing in progress
  • Eugene is fixing EPICS variables list; cron job control needed (cdev -> ca, -9999. will be monitored)