Line 19: Line 19:
* we'll conduct counting house cleanup (remove rack, clean table, exsess old equipment)
* we'll conduct counting house cleanup (remove rack, clean table, exsess old equipment)


* fan fixed in LAC HV (Danny)
* fan was fixed in one of LAC HV mainframes by Danny


* another sy527 sent to repair (Jacobs)
* another sy527 HV mainframe was sent to repair by George Jacobs


* we asked Volker to check Lecroy mainframe repair, may involve procurement to speedup repair
* Lei tried to fix EC sec4 mainframe problem, it still alarms ...


* EC sec4 mainframe problem fixed by replacing cards (Li), #2,4,1 still gives alarms ...
* we asked Volker to deal with Universal Voltronics, the company which does Lecroy mainframe repair; we are not happy with both repair quality and schedule; it maybe necessary to involve procurement division


* mf labeled (Nerses), need list for shift takers, which mf correcponds to which ioc etc
* mf labeled (Nerses), need list for shift takers, which mf correcponds to which ioc etc

Revision as of 12:42, 19 October 2007

present: Sergey Boyarinov, Eugene Pasyuk, Benjamin Raydo, Sergey Pozdnyakov, Stepan Stepanyan, Nerses Gevorgyan, David Jenkins, Chris Cuevas

DVCS Trigger

  • we want for calibration: pi0 (2 clusters, 3x50=88%), efficiency above 90%; for production: one cluster with hodoscope on separate trigger bit (make sure latch is working, although electron will go to one of them, CLAS or DVCS), we are expecting powerful hits (3+ hits)
  • we have to set threshold low because of TDCs
  • hodoscope: 3x3 tower size, match will be enforced by overlaping; overlaping area can be another parameter


G9-FROST preparations

We discussed what should be done before G9A run start. Following issues came up:

  • Franz implemented new monitoring features into fast online reconstruction; Sergey will talk to Franz to see what should be done to make sure it works
  • we'll conduct counting house cleanup (remove rack, clean table, exsess old equipment)
  • fan was fixed in one of LAC HV mainframes by Danny
  • another sy527 HV mainframe was sent to repair by George Jacobs
  • Lei tried to fix EC sec4 mainframe problem, it still alarms ...
  • we asked Volker to deal with Universal Voltronics, the company which does Lecroy mainframe repair; we are not happy with both repair quality and schedule; it maybe necessary to involve procurement division
  • mf labeled (Nerses), need list for shift takers, which mf correcponds to which ioc etc
  • Chris: check l2, and check DC stop signal on SF south pulsers
  • request to CC submitted on 'g9a' SILO partition
  • epics_monitor switched from CDEV to CA, former gamma_monitor incurporated inside, everything is driven by config files in $CLON_PARMS/epics/ area, looks good but have to make sure all output are Ok; Eugene looking into set
  • $CLON_LOG area moved to 300GB /data disk to avoid $CLON_PARMS overflow
  • work in progress to implement IOC resets/heartbeats; will include tagger_mac as well