October 17, 2007 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 19: | Line 19: | ||
* we'll conduct counting house cleanup (remove rack, clean table, exsess old equipment) | * we'll conduct counting house cleanup (remove rack, clean table, exsess old equipment) | ||
* fan fixed in LAC HV | * fan was fixed in one of LAC HV mainframes by Danny | ||
* another sy527 sent to repair | * another sy527 HV mainframe was sent to repair by George Jacobs | ||
* | * Lei tried to fix EC sec4 mainframe problem, it still alarms ... | ||
* | * we asked Volker to deal with Universal Voltronics, the company which does Lecroy mainframe repair; we are not happy with both repair quality and schedule; it maybe necessary to involve procurement division | ||
* mf labeled (Nerses), need list for shift takers, which mf correcponds to which ioc etc | * mf labeled (Nerses), need list for shift takers, which mf correcponds to which ioc etc |
Revision as of 12:42, 19 October 2007
present: Sergey Boyarinov, Eugene Pasyuk, Benjamin Raydo, Sergey Pozdnyakov, Stepan Stepanyan, Nerses Gevorgyan, David Jenkins, Chris Cuevas
DVCS Trigger
- we want for calibration: pi0 (2 clusters, 3x50=88%), efficiency above 90%; for production: one cluster with hodoscope on separate trigger bit (make sure latch is working, although electron will go to one of them, CLAS or DVCS), we are expecting powerful hits (3+ hits)
- we have to set threshold low because of TDCs
- hodoscope: 3x3 tower size, match will be enforced by overlaping; overlaping area can be another parameter
G9-FROST preparations
We discussed what should be done before G9A run start. Following issues came up:
- Franz implemented new monitoring features into fast online reconstruction; Sergey will talk to Franz to see what should be done to make sure it works
- we'll conduct counting house cleanup (remove rack, clean table, exsess old equipment)
- fan was fixed in one of LAC HV mainframes by Danny
- another sy527 HV mainframe was sent to repair by George Jacobs
- Lei tried to fix EC sec4 mainframe problem, it still alarms ...
- we asked Volker to deal with Universal Voltronics, the company which does Lecroy mainframe repair; we are not happy with both repair quality and schedule; it maybe necessary to involve procurement division
- mf labeled (Nerses), need list for shift takers, which mf correcponds to which ioc etc
- Chris: check l2, and check DC stop signal on SF south pulsers
- request to CC submitted on 'g9a' SILO partition
- epics_monitor switched from CDEV to CA, former gamma_monitor incurporated inside, everything is driven by config files in $CLON_PARMS/epics/ area, looks good but have to make sure all output are Ok; Eugene looking into set
- $CLON_LOG area moved to 300GB /data disk to avoid $CLON_PARMS overflow
- work in progress to implement IOC resets/heartbeats; will include tagger_mac as well