October 10, 2007 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 7: | Line 7: | ||
* datafile containing DVCS raw data was created by Rustam and Sergey and passed to Ben | * datafile containing DVCS raw data was created by Rustam and Sergey and passed to Ben | ||
* Ben made event display to present and control cluster reconstruction process using Altera simulation tools; it has two adjustable parameters: single channel threshold (the same for all channels, was set to 50) and minimum number of hits per cluster (was set to 3); cluster finding window has fixed size 3x3 towers (bigger or variable size winow requires more space in FPGA); future plan includes processing good file with different parameters, making 2DIM plots, | * Ben made event display to present and control cluster reconstruction process using Altera simulation tools; it has two adjustable parameters: single channel threshold (the same for all channels, was set to 50) and minimum number of hits per cluster (was set to 3); cluster finding window has fixed size 3x3 towers (bigger or variable size winow requires more space in FPGA); future plan includes processing good file with different parameters, making 2DIM plots, getting efficiency, then processing all data and getting rejection | ||
* we discussed how much regular user have to learn anout v1495 programming; it maybe good idea to learn Altera graphic tool which allows to assemble simple logic from prepared components | * we discussed how much regular user have to learn anout v1495 programming; it maybe good idea to learn Altera graphic tool which allows to assemble simple logic from prepared components |
Revision as of 12:42, 16 October 2007
present: Sergey Boyarinov, Elliott Wolin, Eugene Pasyuk, Benjamin Raydo, Nerses Gevorgyan, Nikolay Balasanyan, Tanest Chinwanawich, Serguei Pozdnyakov, Stepan Stepanyan
DVCS Trigger System
Following progress was made since meeting last week:
- datafile containing DVCS raw data was created by Rustam and Sergey and passed to Ben
- Ben made event display to present and control cluster reconstruction process using Altera simulation tools; it has two adjustable parameters: single channel threshold (the same for all channels, was set to 50) and minimum number of hits per cluster (was set to 3); cluster finding window has fixed size 3x3 towers (bigger or variable size winow requires more space in FPGA); future plan includes processing good file with different parameters, making 2DIM plots, getting efficiency, then processing all data and getting rejection
- we discussed how much regular user have to learn anout v1495 programming; it maybe good idea to learn Altera graphic tool which allows to assemble simple logic from prepared components
- we've got quotation for 2 more v895 discriminators from CAEN, they will be ordered
- we talked very preliminary about hodoscope, which will be located in front of DVCS calorimeter and have about 60 channels; v895's discriminators and v1495's logic units must be purchased for that device; it will be good to have hodoscope drawing in a couple of months, we may consider to add hodoscope outputs to the DVCS trigger system
- we'll try to borrow one more v1495 from Hall A for 2-board testing
Projects
- 2eSST test for v1190/v1290 started in the Hall, ec4 equiped with mvme6100
- new ET installed, everything looks good so far; et_2_et has new option direct for communication between machines which are not sharing any subnets
- old CAEN sy527 mainframes in LAC area are included into new EPICS (Sergey B., Nerses, Hovanes); some troubles communicating with v288 CAENET controller; will run for a while to get experience
TODO:
- HV in wolfram area need remote control (serial ?)
- include LAC into old EPICS GUIs
- ioc reboot/heartbeat buttons
- fix fan in mainframe 1 in LAC (Tom Carstens)
- send sy257 which just arrived fro repair back to repair (who is tracking them ?)
G9-FROST preparations
- CED for new TOFs
- online recsis (Eugene, Jerry)
- DC pulser run
- ADBs, level2 check (Chris)
- pedestal run (soft fixed) (netonpmc etc - automatically !!)
- TDC, TOF laser, EC calibration runs
- new SILO directory 'g9a'
- fix list of logbook receivers (run coordinator, PDL - what time periods ?): DAN PDL, Eugene run coord
- trigger: single sector TOFxST with and without Level2 (sector-based); norm trigger sync 1 only (grom g13_norm)
copy from g8b
- helicity correction: fix error around flip
- before and during the run we'll use G9-FROST page to store information related to the DAQ/Online systems
- new EPICS channels from target, list will come from Eugene; check existing list for availability, add new if necessary
fast and long injection
- run starts Oct 23 (commissioning for 6 days)