Line 9: Line 9:
* got quotation for 2 more v895 discriminators, will be ordered
* got quotation for 2 more v895 discriminators, will be ordered


* hodoscope - 60 channels: v895's for them
* hodoscope - 60 channels: v895's for them (good to have drawing in a couple of month, may add to the same trigger system or external and coinside later using )


* borrow v1495 asap
* borrow v1495 asap
Line 22: Line 22:


TODO:
TODO:
* HV in wolfram area need remote control (serial ?)


* include LAC into old EPICS GUIs
* include LAC into old EPICS GUIs


* ioc reboot buttons
* ioc reboot/heartbeat buttons


* fix fan in mainframe 1 in LAC (Tom Carstens)
* fix fan in mainframe 1 in LAC (Tom Carstens)
Line 33: Line 35:
'''G9-FROST preparations'''
'''G9-FROST preparations'''


* calibration runs
* CED for new TOFs


* new SILO directory
* online recsis (Eugene, Jerry)


* fix list of page receivers (run coordinator, PDL - what time periods ?)
* DC pulser run
 
* ADBs, level2 check (Chris)
 
* pedestal run (soft fixed) (netonpmc etc - automatically !!)
 
* TDC, TOF laser, EC calibration runs
 
* new SILO directory 'g9a'
 
* fix list of logbook receivers (run coordinator, PDL - what time periods ?): DAN PDL, Eugene run coord
 
* trigger: single sector TOFxST with and without Level2 (sector-based); norm trigger sync 1 only (grom g13_norm)
copy from g8b


* helicity correction: fix error around flip
* helicity correction: fix error around flip


* before and during the run we'll use [[G9-FROST]] page to store information related to the DAQ/Online systems
* before and during the run we'll use [[G9-FROST]] page to store information related to the DAQ/Online systems
* new EPICS channels from target, list will come from Eugene; check existing list for availability, add new if necessary
fast and long injection
* run starts Oct 23 (commissioning for 6 days)

Revision as of 10:06, 10 October 2007

present: Sergey Boyarinov, Elliott Wolin, Eugene Pasyuk, Ben Raydo, Nerses*2, Tanest, Serguei, Stepan

DVCS Trigger System

  • datafile containing DVCS raw data was created and passed to Ben
  • Ben: threshold 50 (adjustable), event display, hits per cluster 3 (adjustable), window 3x3, bigger or variable requires more space in FPGA; Ben will run good file through with different 50 and 3, make 2DIM plot, get efficiency, then process all data and get rejection; simple tool for simple logic ??
  • got quotation for 2 more v895 discriminators, will be ordered
  • hodoscope - 60 channels: v895's for them (good to have drawing in a couple of month, may add to the same trigger system or external and coinside later using )
  • borrow v1495 asap

Projects

  • 2eSST test for v1190/v1290 started in the Hall, ec4 equiped with mvme6100
  • new ET installed, everything looks good so far; et_2_et has new option direct for communication between machines which are not sharing any subnets
  • old CAEN sy527 mainframes in LAC area are included into new EPICS (Sergey B., Nerses, Hovanes); some troubles communicating with v288 CAENET controller; will run for a while to get experience

TODO:

  • HV in wolfram area need remote control (serial ?)
  • include LAC into old EPICS GUIs
  • ioc reboot/heartbeat buttons
  • fix fan in mainframe 1 in LAC (Tom Carstens)
  • send sy257 which just arrived fro repair back to repair (who is tracking them ?)

G9-FROST preparations

  • CED for new TOFs
  • online recsis (Eugene, Jerry)
  • DC pulser run
  • ADBs, level2 check (Chris)
  • pedestal run (soft fixed) (netonpmc etc - automatically !!)
  • TDC, TOF laser, EC calibration runs
  • new SILO directory 'g9a'
  • fix list of logbook receivers (run coordinator, PDL - what time periods ?): DAN PDL, Eugene run coord
  • trigger: single sector TOFxST with and without Level2 (sector-based); norm trigger sync 1 only (grom g13_norm)

copy from g8b

  • helicity correction: fix error around flip
  • before and during the run we'll use G9-FROST page to store information related to the DAQ/Online systems
  • new EPICS channels from target, list will come from Eugene; check existing list for availability, add new if necessary

fast and long injection

  • run starts Oct 23 (commissioning for 6 days)