October 10, 2007 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
Boiarino (talk | contribs)
No edit summary
Boiarino (talk | contribs)
No edit summary
Line 35: Line 35:
* helicity correction: fix error around flip
* helicity correction: fix error around flip


* before and during the run we'll use [G9-FROST] page to store online-system-related run information
* before and during the run we'll use [[G9-FROST]] page to store online-system-related run information

Revision as of 08:47, 10 October 2007

present: Sergey Boyarinov,

DVCS Trigger System

  • datafile containing DVCS raw data was created and passed to Ben
  • got quotation for 2 more v895 discriminators, will be ordered

Projects

  • 2eSST test for v1190/v1290 started in the Hall, ec4 equiped with mvme6100
  • new ET installed, everything looks good so far; et_2_et has new option direct for communication between machines which are not sharing any subnets
  • old CAEN sy527 mainframes in LAC area are included into new EPICS (Sergey B., Nerses, Hovanes); some troubles communicating with v288 CAENET controller; will run for a while to get experience

TODO:

  • include LAC into old EPICS GUIs
  • ioc reboot buttons
  • fix fan in mainframe 1 in LAC (Tom Carstens)
  • send sy257 which just arrived fro repair back to repair (who is tracking them ?)

G9-FROST preparations

  • calibration runs
  • new SILO directory
  • fix list of page receivers (run coordinator, PDL - what time periods ?)
  • helicity correction: fix error around flip
  • before and during the run we'll use G9-FROST page to store online-system-related run information