October 3, 2007 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
DVCS Trigger System | DVCS Trigger System | ||
Line 7: | Line 8: | ||
* PCAL (works, +5V fixed, signal distr board replaced, 1 sec delay introduced in 'go' to fix hunging) | * PCAL (works, +5V fixed, signal distr board replaced, 1 sec delay introduced in 'go' to fix hunging; Stepan asked about | ||
10times better ADC resolution - >2Gsample card ???) | |||
Line 14: | Line 15: | ||
* Lecroy repairs, sy527 AC connectors replacement | * Lecroy repairs, sy527 AC connectors replacement (will Chris) | ||
* PrPMC880 replacement | * PrPMC880 replacement | ||
Line 20: | Line 21: | ||
* Frost preparations: all power turned on including DC FASTBUS crates, ethernet/serial cables ran for target platform; | * Frost preparations: all power turned on including DC FASTBUS crates, ethernet/serial cables ran for target platform; | ||
Carl still working on ET modifications, tests to be started dayli, new version expected in about a week, we'll wait, do | Carl still working on ET modifications, tests to be started dayli, new version expected in about a week, we'll wait, do | ||
modifications and then run full CLAS DAQ test | modifications and then run full CLAS DAQ test; new EPICS channels from target | ||
TODO: | TODO: |
Revision as of 09:53, 3 October 2007
DVCS Trigger System
Projects
- PCAL (works, +5V fixed, signal distr board replaced, 1 sec delay introduced in 'go' to fix hunging; Stepan asked about
10times better ADC resolution - >2Gsample card ???)
- Wolfram (works, ROOT too slow and will be addressed during upcoming run preparations)
- Lecroy repairs, sy527 AC connectors replacement (will Chris)
- PrPMC880 replacement
- Frost preparations: all power turned on including DC FASTBUS crates, ethernet/serial cables ran for target platform;
Carl still working on ET modifications, tests to be started dayli, new version expected in about a week, we'll wait, do modifications and then run full CLAS DAQ test; new EPICS channels from target
TODO:
- sy527 support (similar to sy1527 but in VME crate because of VME CAENAT board v288)
- v1190/v1290 extensive testing (CBLT, slot#, install mv6100 in the hall and switch to 2eSST)
- DVCS Trigger Development
- Hall B electronics inventarization
- Upcoming run preparations on requests (fix flip-related problem in online delay reporting correction procedure, ..)