October 3, 2007 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 14: | Line 14: | ||
* Lecroy repairs, sy527 AC connectors replacement | |||
* PrPMC880 replacement | |||
* Frost preparations: all power turned on including DC FASTBUS crates, ethernet/serial cables ran for target platform; | * Frost preparations: all power turned on including DC FASTBUS crates, ethernet/serial cables ran for target platform; | ||
Line 26: | Line 29: | ||
* DVCS Trigger Development | * DVCS Trigger Development | ||
* Hall B electronics inventarization | |||
* Upcoming run preparations on requests (fix flip-related problem in online delay reporting correction procedure, ..) | * Upcoming run preparations on requests (fix flip-related problem in online delay reporting correction procedure, ..) |
Revision as of 08:51, 3 October 2007
DVCS Trigger System
Projects
- PCAL
- Wolfram
- Lecroy repairs, sy527 AC connectors replacement
- PrPMC880 replacement
- Frost preparations: all power turned on including DC FASTBUS crates, ethernet/serial cables ran for target platform;
Carl still working on ET modifications, tests to be started dayli, new version expected in about a week, we'll wait, do modifications and then run full CLAS DAQ test
TODO:
- sy527 support (similar to sy1527 but in VME crate because of VME CAENAT board v288)
- v1190/v1290 extensive testing (CBLT, slot#, install mv6100 in the hall and switch to 2eSST)
- DVCS Trigger Development
- Hall B electronics inventarization
- Upcoming run preparations on requests (fix flip-related problem in online delay reporting correction procedure, ..)