September 19, 2007 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 1: | Line 1: | ||
present: Sergey Boyarinov, Sergey Pozdnyakov, Elliott Wolin, Eugene Pasyuk, Stepan Stepanyan, Valery Kubarovsky, Nerses Gevorgyan, Nikolay Balasanyan | present: Sergey Boyarinov, Sergey Pozdnyakov, Elliott Wolin, Eugene Pasyuk, Stepan Stepanyan, Valery Kubarovsky, Nerses Gevorgyan, Nikolay Balasanyan | ||
PCAL (preshower calorimeter) test setup is almost ready. Missing hardware includes 20m flat delay cable between discriminator and TDC, all the rest seems in place. Some software work still needed: 'PATH too long' problem, IOC for HV mainframe etc. |
Revision as of 13:26, 24 September 2007
present: Sergey Boyarinov, Sergey Pozdnyakov, Elliott Wolin, Eugene Pasyuk, Stepan Stepanyan, Valery Kubarovsky, Nerses Gevorgyan, Nikolay Balasanyan
PCAL (preshower calorimeter) test setup is almost ready. Missing hardware includes 20m flat delay cable between discriminator and TDC, all the rest seems in place. Some software work still needed: 'PATH too long' problem, IOC for HV mainframe etc.