September 5, 2007 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
Boiarino (talk | contribs)
No edit summary
Boiarino (talk | contribs)
No edit summary
Line 7: Line 7:
1. CLAS12 trigger and DAQ systems detailed design which should be ready by next summer, Sergey B. will work with Fast Electronics Group to prepare that.
1. CLAS12 trigger and DAQ systems detailed design which should be ready by next summer, Sergey B. will work with Fast Electronics Group to prepare that.


2. Trigger system for DVCS calorimeter. We purchased and installed pretrigger discriminators and v1495 trigger board, and started to work with Altera tools required to program v1495 board. In ideal case we want that board to look for 3x3 clusters in calorimeter.
2. Trigger system for DVCS calorimeter. We purchased and installed pretrigger discriminators and v1495 trigger board, and started to work with Altera tools required to program v1495 board. In ideal case we want that board to look for 3x3 clusters in calorimeter. Roman Pomatsalyuk works with v1495 for Hall A. That project can be good start for CLAS12 trigger development, we may run it in few following month, although it should be ready by the end of next summer.
 
3.

Revision as of 22:56, 11 September 2007

present: Sergey Boyarinov, Sergey Pozdnyakov, Stepan Stepanyan, Eugene Pasyuk, Nerses Gevorgyan

We discussed long- and short-term jobs we'd like to complete.

Long-term projects:

1. CLAS12 trigger and DAQ systems detailed design which should be ready by next summer, Sergey B. will work with Fast Electronics Group to prepare that.

2. Trigger system for DVCS calorimeter. We purchased and installed pretrigger discriminators and v1495 trigger board, and started to work with Altera tools required to program v1495 board. In ideal case we want that board to look for 3x3 clusters in calorimeter. Roman Pomatsalyuk works with v1495 for Hall A. That project can be good start for CLAS12 trigger development, we may run it in few following month, although it should be ready by the end of next summer.

3.