November 6, 2019 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
Boiarino (talk | contribs)
No edit summary
Boiarino (talk | contribs)
No edit summary
Line 32: Line 32:


* Irakli will return to old firmware/software for MM - beginning of next week
* Irakli will return to old firmware/software for MM - beginning of next week
* enforce comment gui to be in center and on top
* end run begin run time

Revision as of 10:35, 6 November 2019

present: Sergey Boyarinov, Raffaella, Stepan, Ben, Nathan

1. Upcoming run: have to be ready for Nov 22

  • some boards replacement: FADC in BAND, TDC1190 in PCAL, maybe one FADC in FT hodoscope (Ben will look)
  • switch replacement on pie tower - tomorrow by CC
  • helicity flip rate will be 120Hz, 90us t-settle (dead time during flip); Sergey isl working to improve online correction procedure
  • new fileserver: Paul Letta has some issues with new fileserver, will push transition to it to January break
  • clon10 and switches in the hall: clon10 will be pushed to January since it is convenient to do it together with new fileserver; Sergey will reconnect 167 on FC to new switches
  • RF board not reset every run, Sergey will apply fix
  • beam structure control is in progress of designing: will put one dsc2 and one tdc1190 into VME crate on pie tower, put CPU in and start writing software
  • new 10G cards in VME CPUs - issues resolved by Moffit, Sergey will install and configure it in mvt1 and mvt2
  • FADCs for HDIce shows problems, Ed is investigating: problem was in config files, boards are fine
  • classc1 loaded with new vxWorks kernel with bigger amount of file descriptors, did not help; installing new controller helped, it is ON for 14 days
  • NEED to cleanup pie tower table (and crates)
  • run start time and end time have to be on 'GO' and on 'End' or whatever
  • short step stools will be moved to desired location in the hall
  • trigger will be modified - Valery; Silvia will generate new dc roads; will run random trigger validation, this time with higher event rate since FADCs has busy corrected
  • Irakli will return to old firmware/software for MM - beginning of next week
  • enforce comment gui to be in center and on top
  • end run begin run time