March 13, 2019 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
Created page with "present: Sergey Boyarinov, Eugene Pasyuk, Stepan, Ben, Nathan, Raffaella 1. RG-A run preparations 2. HPS run work" |
No edit summary |
||
Line 1: | Line 1: | ||
present: Sergey Boyarinov, Eugene Pasyuk, Stepan, Ben, Nathan, Raffaella | present: Sergey Boyarinov, Eugene Pasyuk, Stepan, Ben, Nathan, Raffaella, vpk | ||
1. RG-A run preparations | 1. RG-A run preparations | ||
* RG-A starts March 19 or 20 with few hours switch time | |||
* target will be changed from D2 to H2, probably around midnight from 19 to 20 of March, plan will be discussed | |||
* no other configuration changes expected expect trigger | |||
* trigger for RGA: restore fall conditions: 3 triggers with FTCAL, HODO, CTOF; and probably add CND geometrically matched with CTOF | |||
* all fiber required connected already, or will be connected in next downtime before March 19, no other hardware changes are required | |||
* firmware change is required to central SSP only where CTOF and CND will be connected by fibers, Ben will change firmware and Andrea will prepare recommendations for CTOFxCND coincidence and decide later, initially CND will be in tagging mode | |||
* Ben and Valery will | |||
2. HPS run work | 2. HPS run work |
Revision as of 09:25, 13 March 2019
present: Sergey Boyarinov, Eugene Pasyuk, Stepan, Ben, Nathan, Raffaella, vpk
1. RG-A run preparations
- RG-A starts March 19 or 20 with few hours switch time
- target will be changed from D2 to H2, probably around midnight from 19 to 20 of March, plan will be discussed
- no other configuration changes expected expect trigger
- trigger for RGA: restore fall conditions: 3 triggers with FTCAL, HODO, CTOF; and probably add CND geometrically matched with CTOF
- all fiber required connected already, or will be connected in next downtime before March 19, no other hardware changes are required
- firmware change is required to central SSP only where CTOF and CND will be connected by fibers, Ben will change firmware and Andrea will prepare recommendations for CTOFxCND coincidence and decide later, initially CND will be in tagging mode
- Ben and Valery will
2. HPS run work