Counting House remodeling: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
* 1st floor: new street door to prevent water leaks; separate climate control for 102 and 102A; humidity control (40%+-10%); replace small round lamps which are failing all the time | * 1st floor: new street door to prevent water leaks; separate climate control for 102 and 102A; humidity control (40%+-10%); replace small round lamps which are failing all the time | ||
* 2nd floor: electronics test and storage area ( | * 2nd floor: electronics test and storage area (5-8 racks, table for soldering, electronics storage cabinets, shelfs for boxes), glass wall between racks and the rest of space with separate climate control for two areas; emergency AC power (similar to room 102) |
Revision as of 15:46, 19 January 2011
Hall B requirements:
- 1st floor: new street door to prevent water leaks; separate climate control for 102 and 102A; humidity control (40%+-10%); replace small round lamps which are failing all the time
- 2nd floor: electronics test and storage area (5-8 racks, table for soldering, electronics storage cabinets, shelfs for boxes), glass wall between racks and the rest of space with separate climate control for two areas; emergency AC power (similar to room 102)