Counting House remodeling: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
* 1st floor: new street door to prevent water leaks; separate climate control for 102 and 102A; humidity control (40%+-10%) | * 1st floor: new street door to prevent water leaks; separate climate control for 102 and 102A; humidity control (40%+-10%) | ||
* 2nd floor: electronics test and storage area (10 racks, table for soldering, electronics cabinets, shelfs for boxes), glass wall between racks and the rest of space, separate climate control | * 2nd floor: electronics test and storage area (10 racks, table for soldering, electronics storage cabinets, shelfs for boxes), glass wall between racks and the rest of space, separate climate control |
Revision as of 15:26, 19 January 2011
Hall B requirements:
- 1st floor: new street door to prevent water leaks; separate climate control for 102 and 102A; humidity control (40%+-10%)
- 2nd floor: electronics test and storage area (10 racks, table for soldering, electronics storage cabinets, shelfs for boxes), glass wall between racks and the rest of space, separate climate control