May 26, 2010 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 3: | Line 3: | ||
1. Current run status: several problems were observed: | 1. Current run status: several problems were observed: | ||
* all level2 reset lines were connected, automatic reset system under testing | |||
* tage3 cannot boot sometimes, 'vital data ...' message is showing up, power recycle helps; may need to re-flash, or replace the CPU board | * tage3 cannot boot sometimes, 'vital data ...' message is showing up, power recycle helps; may need to re-flash, or replace the CPU board | ||
* dc10 had readout problem, FASTBUS termination cards were replaced, it works now, will try to check removed card to confirm the problem cause and fix them | |||
* tage was power recycled once because did to boot remotely, works fine now | * tage was power recycled once because did to boot remotely, works fine now | ||
* end run failed still happens, need more information, will ask shift personal to record messages from clastrig2 | * end run failed still happens, need more information, will ask shift personal to record messages from clastrig2 |
Revision as of 10:42, 1 June 2010
present: Sergey Boyarinov, Sergey Pozdnyakov, Eugene Pasyuk, Stepan Stepanyan
1. Current run status: several problems were observed:
- all level2 reset lines were connected, automatic reset system under testing
- tage3 cannot boot sometimes, 'vital data ...' message is showing up, power recycle helps; may need to re-flash, or replace the CPU board
- dc10 had readout problem, FASTBUS termination cards were replaced, it works now, will try to check removed card to confirm the problem cause and fix them
- tage was power recycled once because did to boot remotely, works fine now
- end run failed still happens, need more information, will ask shift personal to record messages from clastrig2
- run_log_begin sometimes segment faults, as result txt file does not creates and database is not updating, will put debug messages and watch
2. Others
- while no decision yet on the next run, we'll start preparations for primex2, because it may take a while to restore its DAQ; list of missing electronics was created, we'll assemble missing boards and repair broken ones; daq will be configured (CLAS version with coda format), and we'll try to run DAQ in parallel with current run