February 24, 2010 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
No edit summary
 
No edit summary
 
Line 2: Line 2:


- 4 signals routed to FC and SF, 3 looks fine, Quartet is missing (Strob comes
- 4 signals routed to FC and SF, 3 looks fine, Quartet is missing (Strob comes
instread, will check with Suleiman); manual is in clonwiki; need to adjust
instread, will check with Suleiman Raid); manual is in clonwiki; need to adjust
our electronics to use MCC veto instead of our; will take optic converter
our electronics to use MCC veto instead of ours; will take optic converter
from Chris and install in Counting Room
from Chris and install in Counting Room


- readout to be adjusted; may need not-reset scaler to count helicity strobs
- readout to be adjusted; may need non-reset scaler to count helicity strobs


- EPICS part to be adjusted (with Stepan and Chris)
- EPICS part to be adjusted (with Stepan and Chris)
Line 15: Line 15:
clastrig2, Ben is working to route sector-based level1 around TS2 directly
clastrig2, Ben is working to route sector-based level1 around TS2 directly
to the Level2 latch, rewiring and tests scheduled preliminary for Friday
to the Level2 latch, rewiring and tests scheduled preliminary for Friday
February 26 (with Ed, Ben, Chris); will cleanup logic in uppper camac crate
February 26 (with Ed, Ben, Chris)
(ask VPK); give pager to Chris


3. Other
3.Other issues:
 
- need to cleanup logic in uppper camac crate (ask VPK); give pager to Chris


- 4 new monitors arrived, will be installed
- 4 new monitors arrived, will be installed


- clonpc3 RHEL5 upgrade is in progress
- clonpc3 RHEL5 upgrade is in progress, ather PCs will follow


- full DAQ test - Monday March 1
- full DAQ test - Monday March 1

Latest revision as of 11:46, 25 February 2010

1. Helicity:

- 4 signals routed to FC and SF, 3 looks fine, Quartet is missing (Strob comes instread, will check with Suleiman Raid); manual is in clonwiki; need to adjust our electronics to use MCC veto instead of ours; will take optic converter from Chris and install in Counting Room

- readout to be adjusted; may need non-reset scaler to count helicity strobs

- EPICS part to be adjusted (with Stepan and Chris)

2. Level 2

- 6U cage was installed in clastrig2, level2 electronics was moved to clastrig2, Ben is working to route sector-based level1 around TS2 directly to the Level2 latch, rewiring and tests scheduled preliminary for Friday February 26 (with Ed, Ben, Chris)

3.Other issues:

- need to cleanup logic in uppper camac crate (ask VPK); give pager to Chris

- 4 new monitors arrived, will be installed

- clonpc3 RHEL5 upgrade is in progress, ather PCs will follow

- full DAQ test - Monday March 1