Flash ADC Studies: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
Line 10: | Line 10: | ||
Project was completed in November 2006. | Project was completed in November 2006. | ||
CLAS Note 2006-023 "Study of Flash ADCs as a new electronics for CLAS" | CLAS Note 2006-023 "Study of Flash ADCs as a new electronics for CLAS" | ||
presents the results of study of Struck SIS3320. | presents the results of study of Struck SIS3320. | ||
See it in | See it in | ||
[http://www1.jlab.org/ul/Physics/Hall-B/clas/public/2006-023.pdf (pdf)], | [http://www1.jlab.org/ul/Physics/Hall-B/clas/public/2006-023.pdf (pdf)], | ||
[http://www1.jlab.org/ul/Physics/Hall-B/clas/public/2006-023.ps (ps) ] and | [http://www1.jlab.org/ul/Physics/Hall-B/clas/public/2006-023.ps (ps) ] and | ||
[http://www1.jlab.org/ul/Physics/Hall-B/clas/public/2006-023.tex (tex)] | [http://www1.jlab.org/ul/Physics/Hall-B/clas/public/2006-023.tex (tex)] |
Revision as of 12:55, 3 November 2009
Leader: Sergey Pozdnyakov
Support: Sergey Boyarinov, David Abbott, Chris Cuevas, Cole Smith
Goal: obtaining requirements for CLAS12 Flash ADCs
Status: in progress
Project started in April 2006. We are using Struck SIS3320 Flash ADC board.
Project was completed in November 2006.
CLAS Note 2006-023 "Study of Flash ADCs as a new electronics for CLAS"
presents the results of study of Struck SIS3320.