CLAS12 Trigger System Design: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
Boiarino (talk | contribs)
No edit summary
Boiarino (talk | contribs)
No edit summary
Line 13: Line 13:


First very preliminary CLAS12 Trigger System design was presented and discussed on Friday upgrade meeting
First very preliminary CLAS12 Trigger System design was presented and discussed on Friday upgrade meeting
December 15, 2006 ([/wiki/clondocs/CLAS12_Trigger/CLAS12_Trigger.ppt PowerPoint],
December 15, 2006 ([//wiki/clondocs/CLAS12_Trigger/CLAS12_Trigger.ppt PowerPoint],
[http://clonwiki/wiki/clondocs/CLAS12_Trigger/CLAS12_Trigger.ppt.htm HTML]).
[http://clonwiki/wiki/clondocs/CLAS12_Trigger/CLAS12_Trigger.ppt.htm HTML]).



Revision as of 23:25, 18 April 2008

Leader: Sergey Boyarinov

Support: Ben Raydo, David Doughty, Chris Cuevas, Ed Jastrzembski, Konstantin Mikhailov, Alex Vlassov

Goal: CLAS12 Trigger System Design

Status: in progress

Project was planned in June 2006 to be completed during FY07. Actual job started in November 2006. We had several meetings discussing existing CLAS trigger, what can be improved in CLAS12 desing, and new technologies available today. Our work plan was summarized on Wednesday CLON meeting December 13, 2006 (see December 13, 2006 online meeting minutes).

First very preliminary CLAS12 Trigger System design was presented and discussed on Friday upgrade meeting December 15, 2006 (PowerPoint, HTML).

Trigger Efficiency Studies

Trigger efficiency simulation is very important but was not started yet.

Level 1: Forward Calorimeter Cluster Finding

Currently we are trying to develop Forward Calorimeter Cluster Finding algorithm which can be used in Level 1. We started from algorithm used in data analysis, and we hope to develop similar procedure to be loaded into FPGA.

Ed's mail on FPGA-based look up tables:

 Thu, 25 Jan 2007 13:47:39 -0500 (EST)
 To: Serguei Boiarinov <boiarino@jlab.org>
 CC: Hai Dong <hdong@jlab.org>, "C. Cuevas" <cuevas@jlab.org>,
       David Abbott <abbottd@jlab.org>
 Subject: FPGA look up tables
 Hi Sergey,
   I did some investigating on the use of FPGA memory as a look up 
 table for trigger system applications.  For Altera FPGAs, the total 
 on-chip memory can be up to 9 Mbits.  However, the largest single RAM 
 block is 512 Kbits.  This can be organized as     64K x 8, 32K x 16, 16K 
 x 32, ... , or 4K x 128.  Larger chips have multiple 512 Kbit blocks 
 (along with smaller and faster blocks).  Thus, a look up table with as  
 many as 16 inputs and 8 outputs can be created.  Multiple tables can be 
 created in the larger capacity FPGAs.  The downside of using the large 
 capacity FPGAs is that the pin count and cost also increases with memory 
 capacity.  For example, 9 Mbit Altera chips have pin counts of  > 1000 
 pins (BGA) and cost ~$3000 each.
    To test the performance in an Altera FPGA, I created  the following 
 cascaded (2-level) look up table using 512 Kbit segments:   (64K x 8, 
 64K x 8) => (64K x 8).     (i.e. 32 inputs => 8 outputs).   The timing 
 analysis performed by the Altera software indicates that the design will 
 run at > 250MHz clock frequency.  This fits in a 484 pin BGA (with much 
 spare logic).
    I'll check with Hai Dong (Fast Electronics Group) about memory 
 resources in Xilinx FPGAs.  He may also be able to comment on the 
 performance of such a look up table in a Xilinx target.  It is probably 
 comparable to the Altera's speed.
      - Ed J.

Next preliminary CLAS12 Trigger System design was presented and discussed on TWG meeting February 28, 2007 (PowerPoint, PDF, HTML).

Trigger Efficiency Studies

CLAS trigger efficiency study was completed using e1-6 data, result is here PostScript, PDF.


CLAS12 DAQ and Trigger

We had several meetings in March, April and May and finally CLAS12 trigger design was completed. Following document was included into CLAS12 TDR2007. It also contains CLAS12 Data Aquisition System description, probably for the first time we have completed DAQ layout in one document.

DAQ/Trigger section from TDR2007 can be found here PostScript.

The snapshot of the tex directory is here tex directory, permanent place is $CVSROOT/12gev/TDR/TDR2007/main/detector/daq_trigger.

Supporting slides (all pictures with short text) are here Power Point, PDF, HTML.


Timeline chart October 31, 2007 (pdf)

Nov 13, 2007: we are resuming project after DVCS Trigger design reached intermediate finish. Following links contains EC-related Level1 materials: Power Point, PDF, HTML.


Feb 1, 2008: first version of ECFinder in vhdl is ready and passed to Hai. Job was done by Sergey B. under Ben Raydo's supervision. Schematics: PeakFinder(pdf), PeakFinder(eps), ClusterFinder(pdf), ClusterFinder(eps).


Feb 13, 2008: first level 2 discussion, see February 13, 2008 online meeting minutes.