UPS Troubleshooting: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
Sergpozd (talk | contribs)
No edit summary
Sergpozd (talk | contribs)
No edit summary
Line 28: Line 28:
   Give them your name and our company name (Jefferson Laboratory)
   Give them your name and our company name (Jefferson Laboratory)
   Explain a problem
   Explain a problem
   Ask them ‘’’Operator name’’’ and ‘’’Case Number’’’, write it down
   Ask them '''Operator name''' and ‘’’Case Number’’’, write it down
   Be ready to answer questions from Technical Support Operator
   Be ready to answer questions from Technical Support Operator
   Be ready to dictate UPS’s Model Number and Serial Number  
   Be ready to dictate UPS’s Model Number and Serial Number  

Revision as of 10:32, 26 January 2007

UPS CHB1 and UPS CHB2 are Symmetra RM multi-module and multi-battery systems from APC Corporation.

 UPS CHB1
 ========
 Type/Name     : Symmetra RM
 Model Number  : SYHF6KT
 Serial Number : ED0321000736
 UPS CHB2
 ========
 Type/Name     : Symmetra RM
 Model Number  : SYHF6KT
 Serial Number : ED0321000735

We have contract with APC Corp. till 2008

Due to this contract we can contact them any time and ask them for help.

 Technical Support Phone Number   :  800-555-2725
 or Web site for more Information :  http://apc.com/support/


In case of UPS is beeping or has blinking red light:

 Make a call to APC Technical Support
 Be physically nearby to suspicious working UPS
 Give them your name and our company name (Jefferson Laboratory)
 Explain a problem
 Ask them Operator name and ‘’’Case Number’’’, write it down
 Be ready to answer questions from Technical Support Operator
 Be ready to dictate UPS’s Model Number and Serial Number 
 Be ready to follow Operator instructions to check UPS

At the end of check procedure broken module hopefully will be found. APC normally send it to JLab within one-two days in a box with return tag. After receiving and installation of new module, bad one should be returned to APC in delivered box, put return tag on the box. Box should be brought to our Shipping and Delivery in EEL building (Building 90). They will send it back to APC.