3. Streaming DAQ test during nuclear target test | 3. Streaming DAQ test during nuclear target test | ||
* in | * in progress, mostly work but still have stuff to fix | ||
* will run in parallel with item 1 | * will run in parallel with item 1 | ||
Line 36: | Line 36: | ||
4. Slow control: beam monitor is operational based on classc10 | 4. Slow control: beam monitor is operational based on classc10 | ||
5. File server switch pushed to May | |||
6. RICH HV board shows problems, may replace it |
Latest revision as of 10:41, 29 January 2020
present: Sergey Boyarinov, Eugene Pasyuk, Rafo, Ben Raydo, vpk, Stepan
1. Nuclear target test preparations
- Valery prepared trigger files, same as RG-F
- PROD66_noFT_noMM_noBAND will be used
- data to RG-E silo directory
- starts Friday night
- may end Wednesday morning, or goto Friday morning
2. BONUS run preparations (RG-F)
- Valery prepared trigger files, will archive after fixing date preservation
- new MM readout will be tested in EEL, Irakli should be here
- February 12 is start date, will talk again later with BONUS team
3. Streaming DAQ test during nuclear target test
- in progress, mostly work but still have stuff to fix
- will run in parallel with item 1
- may have only 4 nights to run
- will write file instead of tridas if have to
4. Slow control: beam monitor is operational based on classc10
5. File server switch pushed to May
6. RICH HV board shows problems, may replace it