March 12, 2014 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(2 intermediate revisions by 2 users not shown) | |||
Line 4: | Line 4: | ||
'''PLCs:''' Hall B will use | '''PLCs:''' Hall B will use Allen Bradley [http://ab.rockwellautomation.com/Programmable-Controllers/CompactLogix CompactLogix] for reasonable redundency, [http://ab.rockwellautomation.com/Programmable-Controllers/ControlLogix ControlLogix] for higher requirements (magnets etc); micromega will have its own solution they will support | ||
Line 24: | Line 24: | ||
* SVT adcs iocs (v450 etc) - Peter with our support | * SVT adcs iocs (v450 etc) - Peter with our support | ||
* LED | * LED flasher (HPS ECAL, FT calibration) - Glasgow | ||
* DCLV control with new GPIB devices - almost works, will by | * DCLV control with new GPIB devices - almost works, will by prologicx controllers [https://clasweb.jlab.org/wiki/index.php/SC_Forward_Tracker link]. | ||
* move old EPICS iocs to new EPICS base or replace (PS, moller quads, moller helmholz and minitorus magnets, 60Hz scalers, assymmetry (polar crate area), gaussmeter, scalers for faradey cup, tagger magnet for beam commissioning by MSS - for HPS; for CLAS12 - cryotarget) - Hovanes will make more detailed list | * move old EPICS iocs to new EPICS base or replace (PS, moller quads, moller helmholz and minitorus magnets, 60Hz scalers, assymmetry (polar crate area), gaussmeter, scalers for faradey cup, tagger magnet for beam commissioning by MSS - for HPS; for CLAS12 - cryotarget) - Hovanes will make more detailed list | ||
Line 43: | Line 43: | ||
'''GUIs and Alarms''' | '''GUIs and Alarms''' | ||
* for now will use MEDM and ALH, will reconsider later |
Latest revision as of 17:41, 12 March 2014
present: Sergey Boyarinov, Eugene Pasyuk, Ken Livingston, Bryan, Hovanes, Nerses
1. EPICS plans
PLCs: Hall B will use Allen Bradley CompactLogix for reasonable redundency, ControlLogix for higher requirements (magnets etc); micromega will have its own solution they will support
clonioc's net fix
Needed IOCs:
- NEW CAEN HV - exist
- OLD CAEN HV - exist
- MPOD - exist, having problem with memory leak, will investigate
- Motors - exist for old CLAS motors and new HPS motor
- DAQ boards scalers/histograms/... - EPICS presents scalers as waveform (or array) anyway, will use it for both scalers and histograms; server in every crate will be run;
- SVT adcs iocs (v450 etc) - Peter with our support
- LED flasher (HPS ECAL, FT calibration) - Glasgow
- DCLV control with new GPIB devices - almost works, will by prologicx controllers link.
- move old EPICS iocs to new EPICS base or replace (PS, moller quads, moller helmholz and minitorus magnets, 60Hz scalers, assymmetry (polar crate area), gaussmeter, scalers for faradey cup, tagger magnet for beam commissioning by MSS - for HPS; for CLAS12 - cryotarget) - Hovanes will make more detailed list
Translation tables and DB generation process:
Nerses describer his implementation of mapping and DB generation in Hall D, based on mysql; Ken will work on scheme for Hall B
Archiving
As soon as we have logical channel names, will send request to mya group
GUIs and Alarms
- for now will use MEDM and ALH, will reconsider later