March 12, 2014 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
No edit summary
Kliv (talk | contribs)
No edit summary
 
(4 intermediate revisions by 2 users not shown)
Line 4: Line 4:




'''PLCs:''' Hall B will use compactlogics for reasonable redundency, controllogics for higher requirements (magnets etc); micromega will have its own solution they will support
'''PLCs:''' Hall B will use Allen Bradley [http://ab.rockwellautomation.com/Programmable-Controllers/CompactLogix CompactLogix] for reasonable redundency, [http://ab.rockwellautomation.com/Programmable-Controllers/ControlLogix ControlLogix] for higher requirements (magnets etc); micromega will have its own solution they will support




Line 24: Line 24:
* SVT adcs iocs (v450 etc) - Peter with our support
* SVT adcs iocs (v450 etc) - Peter with our support


* LED flusher (HPS ECAL, FT calibration) - Glasgo
* LED flasher (HPS ECAL, FT calibration) - Glasgow


* DCLV control with new GPIB devices - almost works, will by prologic controllers
* DCLV control with new GPIB devices - almost works, will by prologicx controllers [https://clasweb.jlab.org/wiki/index.php/SC_Forward_Tracker link].


* move old EPICS iocs to new EPICS base or replace (PS, moller quads, moller helmholz and minitorus magnets, 60Hz scalers, assymmetry (polar crate area),  gaussmeter, scalers for faradey cup, tagger magnet for beam commissioning by MSS - for HPS; for CLAS12 - cryotarget) - Hovanes will make more detailed list
* move old EPICS iocs to new EPICS base or replace (PS, moller quads, moller helmholz and minitorus magnets, 60Hz scalers, assymmetry (polar crate area),  gaussmeter, scalers for faradey cup, tagger magnet for beam commissioning by MSS - for HPS; for CLAS12 - cryotarget) - Hovanes will make more detailed list
Line 34: Line 34:


Nerses describer his implementation of mapping and DB generation in Hall D, based on mysql; Ken will work on scheme for Hall B
Nerses describer his implementation of mapping and DB generation in Hall D, based on mysql; Ken will work on scheme for Hall B
'''Archiving'''
As soon as we have logical channel names, will send request to mya group
'''GUIs and Alarms'''
* for now will use MEDM and ALH, will reconsider later

Latest revision as of 17:41, 12 March 2014

present: Sergey Boyarinov, Eugene Pasyuk, Ken Livingston, Bryan, Hovanes, Nerses

1. EPICS plans


PLCs: Hall B will use Allen Bradley CompactLogix for reasonable redundency, ControlLogix for higher requirements (magnets etc); micromega will have its own solution they will support


clonioc's net fix


Needed IOCs:

  • NEW CAEN HV - exist
  • OLD CAEN HV - exist
  • MPOD - exist, having problem with memory leak, will investigate
  • Motors - exist for old CLAS motors and new HPS motor
  • DAQ boards scalers/histograms/... - EPICS presents scalers as waveform (or array) anyway, will use it for both scalers and histograms; server in every crate will be run;
  • SVT adcs iocs (v450 etc) - Peter with our support
  • LED flasher (HPS ECAL, FT calibration) - Glasgow
  • DCLV control with new GPIB devices - almost works, will by prologicx controllers link.
  • move old EPICS iocs to new EPICS base or replace (PS, moller quads, moller helmholz and minitorus magnets, 60Hz scalers, assymmetry (polar crate area), gaussmeter, scalers for faradey cup, tagger magnet for beam commissioning by MSS - for HPS; for CLAS12 - cryotarget) - Hovanes will make more detailed list


Translation tables and DB generation process:

Nerses describer his implementation of mapping and DB generation in Hall D, based on mysql; Ken will work on scheme for Hall B


Archiving

As soon as we have logical channel names, will send request to mya group


GUIs and Alarms

  • for now will use MEDM and ALH, will reconsider later