November 30, 2011 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
(3 intermediate revisions by the same user not shown)
Line 1: Line 1:
present: Sergey Boyarinov, Sergey Pozdnyakov
present: Sergey Boyarinov, Sergey Pozdnyakov, FX, Nerses, Hovanes, Eugene Pasyuk


1. g14b: run started week ago, following problems were fixed:
1. g14b: run started week ago, following problems were fixed:
Line 22: Line 22:
* Hall D setup works, including silo part; must be ready to add tage and tage2 later
* Hall D setup works, including silo part; must be ready to add tage and tage2 later


* HPS: ic is installed, connected to old ADCs, IP pedestal procedure works, FX looking at them; JLAB discriminators were installed (16 CLAS, 12 from Hall D), all software is ready to program them; FADCs are installed but not connected; trigger part must be restored (will try to do it in couple of days) and read IC out with CLAS but havinf separate trigger bit from IC
* HPS: ic is installed, connected to old ADCs, IP pedestal procedure works, FX looking at them; JLAB discriminators were installed (16 CLAS, 12 from Hall D), all software is ready to program them; FADCs are installed but not connected; trigger part must be restored (will try to do it in couple of days) and read IC out with CLAS but havinf separate trigger bit from IC; temperature control need to be restored; Nerses will test softioc for discr scalers, will need to replace cpu in pretrig3 installing intel cpu

Latest revision as of 10:40, 30 November 2011

present: Sergey Boyarinov, Sergey Pozdnyakov, FX, Nerses, Hovanes, Eugene Pasyuk

1. g14b: run started week ago, following problems were fixed:

  • level2 cables connected under the CLAS
  • several above-FASTBUS fans replaced, will continue
  • several CPUs replaced because of PMC failures
  • rate was 4 kHz at 85% livetime at 20nA beam current BEFORE level2 fixes, expecting improvements
  • cmon works in electroproduction mode, see target; will calibrate and switch to photoproduction
  • DC noise problem was investigated, Mac found and removed aluminum foil inside region 1, hopefully it will help
  • remaining problems: SLM signel was broken - fixed, Moller should work;


2. Test setups:

  • Hall D setup works, including silo part; must be ready to add tage and tage2 later
  • HPS: ic is installed, connected to old ADCs, IP pedestal procedure works, FX looking at them; JLAB discriminators were installed (16 CLAS, 12 from Hall D), all software is ready to program them; FADCs are installed but not connected; trigger part must be restored (will try to do it in couple of days) and read IC out with CLAS but havinf separate trigger bit from IC; temperature control need to be restored; Nerses will test softioc for discr scalers, will need to replace cpu in pretrig3 installing intel cpu