it will be remodeling, mostly on second level; will try to get Hall B electronics test and storage area on 2nd floor (10 racks, table for soldering, electronics cabinets, shelfs for boxes), and fix a door in room 102; also room 102 need separate climate control in 102 and 102A, and the same on second floor; need humidity control (keep it | it will be remodeling, mostly on second level; will try to get Hall B electronics test and storage area on 2nd floor (10 racks, table for soldering, electronics cabinets, shelfs for boxes), and fix a door in room 102; also room 102 need separate climate control in 102 and 102A, and the same on second floor; need humidity control (keep it 40%+-10%) |
Latest revision as of 10:40, 19 January 2011
present: Sergey Boyarinov, Nerses Gevorgian, Sergey Pozdnyakov, Eugene Pasyuk
1. TPE run status
- EPICS timeline mysqldump errors on empty tables: will check if mysqldump can be forced to ignore it; although some channels are not updating any more,we want to present a history
- logbook still crashing on tomcat, will ask Marty to investigate
- Sergey B. and Ben tried to lunch new level2 trigger yesterday during downtime, some problems were found (unused trig bits gives 'yes' to 12-> lookuptable); Ben will make new firmware and we'll try again; epics part of clastrig2 will be reactivated then
- it is possible that FORCE_SYNC process cost problems in clastrig2, will investigate
- battery was replaced in UPS2 (Sergey P.)
- 8 CAEN A1535 boards were sent to repair, as well as v792 fro Vitali test setup; Vitali's setup works temporary with Lecroy 1182 ADC taken from Yuri; test setup CTOF DAQ works fine in new mezzanine place, 86 subnet is operational
- LAC still to be commissioned
2 Counting house remodeling
it will be remodeling, mostly on second level; will try to get Hall B electronics test and storage area on 2nd floor (10 racks, table for soldering, electronics cabinets, shelfs for boxes), and fix a door in room 102; also room 102 need separate climate control in 102 and 102A, and the same on second floor; need humidity control (keep it 40%+-10%)