February 24, 2010 online meeting minutes: Difference between revisions
No edit summary |
No edit summary |
||
Line 2: | Line 2: | ||
- 4 signals routed to FC and SF, 3 looks fine, Quartet is missing (Strob comes | - 4 signals routed to FC and SF, 3 looks fine, Quartet is missing (Strob comes | ||
instread, will check with Suleiman); manual is in clonwiki; need to adjust | instread, will check with Suleiman Raid); manual is in clonwiki; need to adjust | ||
our electronics to use MCC veto instead of | our electronics to use MCC veto instead of ours; will take optic converter | ||
from Chris and install in Counting Room | from Chris and install in Counting Room | ||
- readout to be adjusted; may need | - readout to be adjusted; may need non-reset scaler to count helicity strobs | ||
- EPICS part to be adjusted (with Stepan and Chris) | - EPICS part to be adjusted (with Stepan and Chris) | ||
Line 15: | Line 15: | ||
clastrig2, Ben is working to route sector-based level1 around TS2 directly | clastrig2, Ben is working to route sector-based level1 around TS2 directly | ||
to the Level2 latch, rewiring and tests scheduled preliminary for Friday | to the Level2 latch, rewiring and tests scheduled preliminary for Friday | ||
February 26 (with Ed, Ben, Chris) | February 26 (with Ed, Ben, Chris) | ||
3.Other issues: | |||
- need to cleanup logic in uppper camac crate (ask VPK); give pager to Chris | |||
- 4 new monitors arrived, will be installed | - 4 new monitors arrived, will be installed | ||
- clonpc3 RHEL5 upgrade is in progress | - clonpc3 RHEL5 upgrade is in progress, ather PCs will follow | ||
- full DAQ test - Monday March 1 | - full DAQ test - Monday March 1 |
Latest revision as of 11:46, 25 February 2010
1. Helicity:
- 4 signals routed to FC and SF, 3 looks fine, Quartet is missing (Strob comes instread, will check with Suleiman Raid); manual is in clonwiki; need to adjust our electronics to use MCC veto instead of ours; will take optic converter from Chris and install in Counting Room
- readout to be adjusted; may need non-reset scaler to count helicity strobs
- EPICS part to be adjusted (with Stepan and Chris)
2. Level 2
- 6U cage was installed in clastrig2, level2 electronics was moved to clastrig2, Ben is working to route sector-based level1 around TS2 directly to the Level2 latch, rewiring and tests scheduled preliminary for Friday February 26 (with Ed, Ben, Chris)
3.Other issues:
- need to cleanup logic in uppper camac crate (ask VPK); give pager to Chris
- 4 new monitors arrived, will be installed
- clonpc3 RHEL5 upgrade is in progress, ather PCs will follow
- full DAQ test - Monday March 1