March 25, 2009 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 2: | Line 2: | ||
1. JLAB discriminator | 1. JLAB discriminator | ||
Ben made a big progress on discriminator design, it is almost ready for prototype building with following features: | |||
* price estimate: components about $1600/board+$200/pcb and assembly+front pannel = $2000 maximum -> $125/channel | * price estimate: components about $1600/board+$200/pcb and assembly+front pannel = $2000 maximum -> $125/channel | ||
Line 11: | Line 13: | ||
2. Work for downtime | 2. Work for downtime | ||
* SY1527 HV problems | * SY1527 HV connectors problems | ||
* clon cluster OS upgrade | * clon cluster OS upgrade |
Latest revision as of 10:02, 26 March 2009
present: Sergey Boyarinov, Ben Raydo, Sergey Pozdnyakov, Chris Cuevas
1. JLAB discriminator
Ben made a big progress on discriminator design, it is almost ready for prototype building with following features:
- price estimate: components about $1600/board+$200/pcb and assembly+front pannel = $2000 maximum -> $125/channel
- need about $7000 for 2 prototypes, will use ops money
- in about 1-1.5 month can expect sample board
2. Work for downtime
- SY1527 HV connectors problems
- clon cluster OS upgrade
- FASTBUS power supply replacement continues
- FASTBUS boards testing in test setup
- CODA improvements (EB recovers, ROC crashes)