  * new clonwiki machine was installed, it will contains clonwiki, inventory database front-end and maybe other documentation; currently not visible from outside
  * new clonwiki machine was installed, it will contains clonwiki, inventory database front-end and maybe other documentation; currently not visible from outside


  * inventory database front-end was installed on clonwiki, under testing; todo: brand link(s) to documentation, brand picture, check tag uniqueness (mysql primary key), make mysql to store history including  person; make different users, some readonly; make maintenance history more advanced, remember date, locations, actions etc; cronjob on 'action needed'; minor fixes in other tables, sort by alphabet (in brand table by 3 fields, add 'edit' as well); make adjustable the number of records per page;sort every table by alphabet or date, up or down, by different columns; check in different browsers; ascii table will be primary source, until front-end is completely ready
  * inventory database front-end was installed on clonwiki, under testing
 
todo: brand link(s) to documentation, brand picture, check tag uniqueness (mysql primary key), make mysql to store history including
  person; make different users, some readonly; make maintenance history more advanced, remember date, locations, actions etc; cronjob on  
'action needed'; minor fixes in other tables, sort by alphabet (in brand table by 3 fields, add 'edit' as well); make adjustable the number of  
records per page;sort every table by alphabet or date, up or down, by different columns; check in different browsers; ascii table will be  
primary source, until front-end is completely ready


  * HV patch panels have bad connectors, need to fix
  * HV patch panels have bad connectors, need to fix


  * repaires in progress
  * repaires in progress

Latest revision as of 11:19, 16 January 2008

present: Sergey Boyarinov, Sergey Pozdnyakov, Eugene Pasyuk

G9A run status

* TDC calibration run, analysis procedure is not operational yet
* Pedestal run and analysis
* run will be ended February 11 6am (Monday), next run will be G12 in April
* need any 2-sector trigger for torus=0 run, it will be on bit 7
* problem: EC HV mainframe 1 shuts itself down, have to go to the hall to turn it on; will open serial line and watch
* network upgrade - crash - GPIB problems (firmware update ?)
* ER crashed twice - very unusual, need to debug

Projects status

* new clonwiki machine was installed, it will contains clonwiki, inventory database front-end and maybe other documentation; currently not visible from outside
* inventory database front-end was installed on clonwiki, under testing
todo: brand link(s) to documentation, brand picture, check tag uniqueness (mysql primary key), make mysql to store history including
person; make different users, some readonly; make maintenance history more advanced, remember date, locations, actions etc; cronjob on 
'action needed'; minor fixes in other tables, sort by alphabet (in brand table by 3 fields, add 'edit' as well); make adjustable the number of 
records per page;sort every table by alphabet or date, up or down, by different columns; check in different browsers; ascii table will be 
primary source, until front-end is completely ready
* HV patch panels have bad connectors, need to fix
* repaires in progress