* TDC calibration run, analysis procedure is not operational yet | * TDC calibration run, analysis procedure is not operational yet | ||
* Pedestal run and analysis | * Pedestal run and analysis | ||
* run will be ended February 11 6am (Monday), next run will be G12 | * run will be ended February 11 6am (Monday), next run will be G12 in April | ||
* need any 2-sector trigger for torus=0 run, it will be on bit 7 | |||
* problem: EC HV mainframe 1 shuts itself down, have to go to the hall to turn it on; will open serial line and watch | |||
* network upgrade - crash - GPIB problems (firmware update ?) | |||
* ER crashed twice - very unusual, need to debug | |||
'''Projects status''' | |||
* new clonwiki machine was installed, it will contains clonwiki, inventory database front-end and maybe other documentation; currently not visible from outside | |||
* inventory database front-end was installed on clonwiki, under testing | |||
todo: brand link(s) to documentation, brand picture, check tag uniqueness (mysql primary key), make mysql to store history including | |||
person; make different users, some readonly; make maintenance history more advanced, remember date, locations, actions etc; cronjob on | |||
'action needed'; minor fixes in other tables, sort by alphabet (in brand table by 3 fields, add 'edit' as well); make adjustable the number of | |||
records per page;sort every table by alphabet or date, up or down, by different columns; check in different browsers; ascii table will be | |||
primary source, until front-end is completely ready | |||
* HV patch panels have bad connectors, need to fix | |||
* repaires in progress |
Latest revision as of 11:19, 16 January 2008
present: Sergey Boyarinov, Sergey Pozdnyakov, Eugene Pasyuk
G9A run status
* TDC calibration run, analysis procedure is not operational yet * Pedestal run and analysis * run will be ended February 11 6am (Monday), next run will be G12 in April * need any 2-sector trigger for torus=0 run, it will be on bit 7 * problem: EC HV mainframe 1 shuts itself down, have to go to the hall to turn it on; will open serial line and watch * network upgrade - crash - GPIB problems (firmware update ?) * ER crashed twice - very unusual, need to debug
Projects status
* new clonwiki machine was installed, it will contains clonwiki, inventory database front-end and maybe other documentation; currently not visible from outside
* inventory database front-end was installed on clonwiki, under testing
todo: brand link(s) to documentation, brand picture, check tag uniqueness (mysql primary key), make mysql to store history including person; make different users, some readonly; make maintenance history more advanced, remember date, locations, actions etc; cronjob on 'action needed'; minor fixes in other tables, sort by alphabet (in brand table by 3 fields, add 'edit' as well); make adjustable the number of records per page;sort every table by alphabet or date, up or down, by different columns; check in different browsers; ascii table will be primary source, until front-end is completely ready
* HV patch panels have bad connectors, need to fix
* repaires in progress