present: Sergey Boyarinov, Sergey Pozdnyakov, Nerses Gevorgyan, Eugene Pasyuk, Hovanes Egiyan | present: Sergey Boyarinov, Sergey Pozdnyakov, Nerses Gevorgyan, Eugene Pasyuk, Hovanes Egiyan, Vitaly Baturin | ||
'''G9A run status''' | |||
* Lecroy 2313 | * several Lecroy 2313 discriminators were replacements: one RF, two TOF (both for new TOF counters); repair status: 5 2313 boards and 5 HV boards were sent for repair, usually takes about month; need JLAB discriminators: James may do redesign in a few month (need official arrangement), James or Chris can do that job, Sergey will talk to Volker again | ||
repair status: 5 2313 | |||
need JLAB | |||
* RF monitoring was improved in PAW | * RF monitoring was improved in PAW-based occupancy plots by Eugene | ||
* few broken LAC HV boards to be repaired, we'll send and Italians will pay | * few broken LAC HV boards to be repaired, we'll send it and Italians will pay | ||
* Jerry built online recsis, it runs but crashes and it does not fill occupancy plots, work in progress | * Jerry built online recsis, it runs but crashes and it does not fill occupancy plots, work in progress | ||
* h2root to | * we will run 'h2root' on 'clonmon' to convert PAW-based occupancy plot files to ROOT files; those files can be viewed by Carrot module | ||
* clasweb: restarted httpd and tomcat to fix; next time may look at log | * clasweb hung again: restarted httpd and tomcat to fix; next time may look at log files | ||
* clon02 key board speaker died ? somebody switched to internal spiker | * clon02 key board speaker died ? somebody switched to internal spiker .. | ||
'''Projects review''' | |||
* CLAS12 trigger: Ben and Sergey are working on level1 (EC clusters); may test next year on real calorimeters | |||
* EPICS: Lecroy HV support was implemented in 3.14 and under testing in classc0 test setup, now we have both CAENs and Lecroy HV implemented, as well as HallSystems; separate alarms will be generated for test setup (Nerses); medm hist problem: sciplot does not support filled hists, xrtgraf do it but need license, Nerses is working to find solution | |||
* EPICS TO DO: use standard iocCore instead of custom ones as it is done now; cleanup: restored, old epics; CAMAC support is in progress | |||
* BONUS readout: PCI TI board is in progress by Ben (will be PCI, not PCI-X, so we need PC with both), we have a list of equipment needed, will buy it shortly after making sure we have necessary software support, will ask David Abbott to look at that | |||
* electronics inventory db: Sergey P. is filling up database, in a meanwhile we can start to implement notification scripts, for example 'repair status' and 'spare status'; also need procedure scripts, for example found spare module, replace module etc; need web frontend; need history !!! (if line changed, create new line, preserve existing one); standard operations (queries): | |||
- search for board type, repair status etc with sorting | |||
- replacement procedure | |||
- repair procedure | |||
- new electronics inserts (status 'ordered', ..) | |||
- decommission items | |||
.............. | |||
will search for existing soft, and make a list of operations we want to have | |||
* on Vitaly's request we'll order equipment for CLAS12 central TOF test setup; Sergey will make PR, Vitaly talk to Volker | |||
Latest revision as of 23:14, 17 December 2007
present: Sergey Boyarinov, Sergey Pozdnyakov, Nerses Gevorgyan, Eugene Pasyuk, Hovanes Egiyan, Vitaly Baturin
G9A run status
- several Lecroy 2313 discriminators were replacements: one RF, two TOF (both for new TOF counters); repair status: 5 2313 boards and 5 HV boards were sent for repair, usually takes about month; need JLAB discriminators: James may do redesign in a few month (need official arrangement), James or Chris can do that job, Sergey will talk to Volker again
- RF monitoring was improved in PAW-based occupancy plots by Eugene
- few broken LAC HV boards to be repaired, we'll send it and Italians will pay
- Jerry built online recsis, it runs but crashes and it does not fill occupancy plots, work in progress
- we will run 'h2root' on 'clonmon' to convert PAW-based occupancy plot files to ROOT files; those files can be viewed by Carrot module
- clasweb hung again: restarted httpd and tomcat to fix; next time may look at log files
- clon02 key board speaker died ? somebody switched to internal spiker ..
Projects review
- CLAS12 trigger: Ben and Sergey are working on level1 (EC clusters); may test next year on real calorimeters
- EPICS: Lecroy HV support was implemented in 3.14 and under testing in classc0 test setup, now we have both CAENs and Lecroy HV implemented, as well as HallSystems; separate alarms will be generated for test setup (Nerses); medm hist problem: sciplot does not support filled hists, xrtgraf do it but need license, Nerses is working to find solution
- EPICS TO DO: use standard iocCore instead of custom ones as it is done now; cleanup: restored, old epics; CAMAC support is in progress
- BONUS readout: PCI TI board is in progress by Ben (will be PCI, not PCI-X, so we need PC with both), we have a list of equipment needed, will buy it shortly after making sure we have necessary software support, will ask David Abbott to look at that
- electronics inventory db: Sergey P. is filling up database, in a meanwhile we can start to implement notification scripts, for example 'repair status' and 'spare status'; also need procedure scripts, for example found spare module, replace module etc; need web frontend; need history !!! (if line changed, create new line, preserve existing one); standard operations (queries):
- search for board type, repair status etc with sorting - replacement procedure - repair procedure - new electronics inserts (status 'ordered', ..) - decommission items ..............
will search for existing soft, and make a list of operations we want to have
- on Vitaly's request we'll order equipment for CLAS12 central TOF test setup; Sergey will make PR, Vitaly talk to Volker