November 7, 2007 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
Boiarino (talk | contribs)
No edit summary
Boiarino (talk | contribs)
No edit summary
 
(13 intermediate revisions by the same user not shown)
Line 1: Line 1:
present: Sergey Boyarinov,  
present: Sergey Boyarinov, Sergey Pozdnyakov, Nerses Gevorgyan, Eugene Pasyuk


We discussed last 2 weeks G9A run preparation activity, following projects were completed:
We discussed last 2 weeks G9A run preparation activity, following projects were completed:


* online reconstruction code was changed significantly: tagger package, start counter package, TOF, calibration constants; now ''cmon'' can perform photon run particle ID on reasonable level of efficiency; we have good target image [] from the begining of the run, and Franz will try to implement data monitoring based on two-particle events; more check needed for new TOF implementation job was completed by Franz Klein, Sergey Boyarinov and Eugene Pasyuk
* online reconstruction code was changed significantly: tagger package, start counter package, TOF, calibration constants; now ''cmon'' can perform photon run particle ID on reasonable level of efficiency; we have good target [http://clonweb/clondocs/Docs/cmon_g9a_firstpage.eps image1], [http://clonweb/clondocs/Docs/cmon_g9a_6vertexes.eps image2] from the begining of the run, and Franz will try to implement data monitoring based on two-particle events; more check needed for new TOF implementation job was completed by Franz Klein, Sergey Boyarinov and Eugene Pasyuk


* Nerses and Sergey finished incorporation CAEN HV mainframes (old vme-ceanet-beased and new unix-based) into epics including heartbeat-based monitoring (so-called HallSysterms) and save/restore facility (so-called burt);  in ioc status GUI we have clonpc1, clonpc2 and camac2 ioc's controlling those HV mainframes; new LAC HV ioc camac2 works well, no problems reported so far
* Nerses and Sergey finished incorporation CAEN HV mainframes (old vme-ceanet-beased and new unix-based) into epics including heartbeat-based monitoring (so-called HallSysterms) and save/restore facility (so-called burt);  in ioc status GUI we have clonpc1, clonpc2 and camac2 ioc's controlling those HV mainframes; new LAC HV ioc camac2 works well, no problems reported so far


* Sergey B. switched from 'cdev' to 'ca' epics channel access for all related packages in $CLON area, mostly in 'epicsutil' and 'runlog' directories; some problems were reported after several days of running, they were fixed, everything looks reasonable now; the list of epics variables still need to be up-to-dated, Sergey is working on it, will be completed before production starts
* Sergey B. switched from 'cdev' to 'ca' epics channel access all related packages in $CLON area, mostly in 'epicsutil' and 'runlog' directories; some problems were reported after several days of running, they were fixed, everything looks reasonable now; the list of epics variables still need to be up-to-dated, Sergey is working on it, will be completed before production starts


* two new monitors were installed, now we have 3 screens on clon02, 3 screens on clon03 and 4 screens on clon04; graphic problem was observed in runcontrol gui, canbe related to the recent changes, currently under investigation
* two new monitors were installed, now we have 3 screens on clon02, 3 screens on clon03 and 4 screens on clon04; graphic problem was observed in runcontrol gui, canbe related to the recent changes, currently under investigation
Line 15: Line 15:
We still need to complete following before production starts:
We still need to complete following before production starts:


* burt-related issues: make burk to save non-HV values (for example elctron or photon run), cron jobs to run burt time-to-time (were running in the past ?)
* understand triggering conditions; we'll try to use MOR in ASYNC, or ST&MOR in ASYNC, most likely on Thursday; Eugene will find repaired CAEN discriminators; we still have discripance between epics and daq scalers, but based on daq scalers we have many accidentals; TOF only trigger shows 8kHz without level2 and 800Hz with level2


* understand triggering conditions
* cleanup EPICS channel list


* cleanup EPICS channel list
* level2 segments requires constant attention, sometimes access to the Hall requires for reboot
 
* Nerses is considering to use  'medm' from new EPICS in old EPICS
 
Long-term projects:
 
* burt-related issues: make burt to save non-HV values (for example electron or photon run), cron jobs to run burt time-to-time (were running in the past for motors ?); Nerses and Sergey B. will look at that
 
* have one epics_monitor storing data somewhere based on config file(s); run_log_begin etc must get from there, not from epics ca directly; probably epics archiving can be used for that purpose (we'll look at epics archiving anyway, burt or built-in)
 
* David Heddle is working to apply new TOF and ST geometry and data format to CED
 
* Sergey P. condicting inventarization, storing data in ascii format; in the end all data will be stored in database, we have to deside on interface to that db
 
* new clonweb and clonmon machines arrived, will install and work on ROOT-carrot and related stuff

Latest revision as of 15:52, 14 November 2007

present: Sergey Boyarinov, Sergey Pozdnyakov, Nerses Gevorgyan, Eugene Pasyuk

We discussed last 2 weeks G9A run preparation activity, following projects were completed:

  • online reconstruction code was changed significantly: tagger package, start counter package, TOF, calibration constants; now cmon can perform photon run particle ID on reasonable level of efficiency; we have good target image1, image2 from the begining of the run, and Franz will try to implement data monitoring based on two-particle events; more check needed for new TOF implementation job was completed by Franz Klein, Sergey Boyarinov and Eugene Pasyuk
  • Nerses and Sergey finished incorporation CAEN HV mainframes (old vme-ceanet-beased and new unix-based) into epics including heartbeat-based monitoring (so-called HallSysterms) and save/restore facility (so-called burt); in ioc status GUI we have clonpc1, clonpc2 and camac2 ioc's controlling those HV mainframes; new LAC HV ioc camac2 works well, no problems reported so far
  • Sergey B. switched from 'cdev' to 'ca' epics channel access all related packages in $CLON area, mostly in 'epicsutil' and 'runlog' directories; some problems were reported after several days of running, they were fixed, everything looks reasonable now; the list of epics variables still need to be up-to-dated, Sergey is working on it, will be completed before production starts
  • two new monitors were installed, now we have 3 screens on clon02, 3 screens on clon03 and 4 screens on clon04; graphic problem was observed in runcontrol gui, canbe related to the recent changes, currently under investigation
  • several days of running shows good online components behaviour, including level2 components; we do not quite understand observed level1 trigger rate yet

We still need to complete following before production starts:

  • understand triggering conditions; we'll try to use MOR in ASYNC, or ST&MOR in ASYNC, most likely on Thursday; Eugene will find repaired CAEN discriminators; we still have discripance between epics and daq scalers, but based on daq scalers we have many accidentals; TOF only trigger shows 8kHz without level2 and 800Hz with level2
  • cleanup EPICS channel list
  • level2 segments requires constant attention, sometimes access to the Hall requires for reboot
  • Nerses is considering to use 'medm' from new EPICS in old EPICS

Long-term projects:

  • burt-related issues: make burt to save non-HV values (for example electron or photon run), cron jobs to run burt time-to-time (were running in the past for motors ?); Nerses and Sergey B. will look at that
  • have one epics_monitor storing data somewhere based on config file(s); run_log_begin etc must get from there, not from epics ca directly; probably epics archiving can be used for that purpose (we'll look at epics archiving anyway, burt or built-in)
  • David Heddle is working to apply new TOF and ST geometry and data format to CED
  • Sergey P. condicting inventarization, storing data in ascii format; in the end all data will be stored in database, we have to deside on interface to that db
  • new clonweb and clonmon machines arrived, will install and work on ROOT-carrot and related stuff