July 15, 2020 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
Boiarino (talk | contribs)
Created page with "present: Sergey, Ben, Rafo, vpk, Stepan, Nathan, pasyuk 1. Rafo presented current status of the DC segment finder for trigger, presentation is [here]"
 
Boiarino (talk | contribs)
No edit summary
 
(5 intermediate revisions by the same user not shown)
Line 1: Line 1:
present: Sergey, Ben, Rafo, vpk, Stepan, Nathan, pasyuk
present: Sergey, Ben, Rafo, vpk, Stepan, Nathan, pasyuk


1.  
1. Dc segment finding in trigger


Rafo presented current status of the DC segment finder for trigger, presentation is [here]
Rafo presented current status of the DC segment finder for trigger, presentation is  
[https://docs.google.com/presentation/d/10BtMRnrov0DTqAyDmS5Qo9pQSO25d7ArHyJCR8Ttalk/edit?usp=sharing. here]. Few days ago Rafo, Sergey, Veronique and Mac had a meeting discussing dc calibration constants needed for trigger purposes, and it was common understanding that formula on page 3 sufficient for our purposes. As next step Rafo will work on fit procedure to estimate spacial resolution we can achieve, following steps will e discussed after that.
 
2. Run preparations
 
Ben prepared new firmware 1.5 for dcrb boards to fix busy condition handling, one dcrb crate upgraded, preliminary high rate test (60kHz) shows that problem solved. All  18 dcrb's will e upgraded and tested on high rate and with cosmic.

Latest revision as of 09:49, 28 July 2020

present: Sergey, Ben, Rafo, vpk, Stepan, Nathan, pasyuk

1. Dc segment finding in trigger

Rafo presented current status of the DC segment finder for trigger, presentation is here. Few days ago Rafo, Sergey, Veronique and Mac had a meeting discussing dc calibration constants needed for trigger purposes, and it was common understanding that formula on page 3 sufficient for our purposes. As next step Rafo will work on fit procedure to estimate spacial resolution we can achieve, following steps will e discussed after that.

2. Run preparations

Ben prepared new firmware 1.5 for dcrb boards to fix busy condition handling, one dcrb crate upgraded, preliminary high rate test (60kHz) shows that problem solved. All 18 dcrb's will e upgraded and tested on high rate and with cosmic.