February 26, 2020 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
Created page with "present: Sergey Boyarinov, Stepan, Nathan, Valery, Ben 1. RG-F run status * DAQ event rate is only few kHz, data rate significantly below 100MB/s because of gas target, wi..." |
No edit summary |
||
(3 intermediate revisions by the same user not shown) | |||
Line 11: | Line 11: | ||
* beam current unlikely to be increased, so we will stay with current settings for entire run | * beam current unlikely to be increased, so we will stay with current settings for entire run | ||
* event rate/data rate were added to DAQ/Trigger EPICS GUIs | |||
* MPOD power supply has some issues - Nathan | |||
* logbook GUI insertion policy may be reconsidered - too many GUIs in logbook | |||
* some network switches keeps dying, replacement installed already on FC, moving wires there; port 48 is set to 10MBit/fullduplex for etherlite32 | |||
* trigger bit names should be in trigger GUI, Ben/Valery will implement it | |||
Line 18: | Line 28: | ||
* reconstruction algorithms to be considered for online data processing: offline code, level1 code, ...; can be tested as 'level3' in current DAQ | * reconstruction algorithms to be considered for online data processing: offline code, level1 code, ...; can be tested as 'level3' in current DAQ | ||
* will investigate different aspects: DAQ (ben,sergey), reconstruction (sergey,gagik), physics motivation/needs (vpk,stepan), human abilities to run reconstruction online, etc | |||
* level3 seems good place to investigate possibility to run reconstruction online |
Latest revision as of 10:50, 26 February 2020
present: Sergey Boyarinov, Stepan, Nathan, Valery, Ben
1. RG-F run status
- DAQ event rate is only few kHz, data rate significantly below 100MB/s because of gas target, with beam current 250nA
- trigger is electron with drift chamber roads and 300MeV EC threshold, seems sufficient for production running
- big dead time produced by RTPC readout, cannot run faster then about 1.5kHz if desired lifetime is above 90%
- beam current unlikely to be increased, so we will stay with current settings for entire run
- event rate/data rate were added to DAQ/Trigger EPICS GUIs
- MPOD power supply has some issues - Nathan
- logbook GUI insertion policy may be reconsidered - too many GUIs in logbook
- some network switches keeps dying, replacement installed already on FC, moving wires there; port 48 is set to 10MBit/fullduplex for etherlite32
- trigger bit names should be in trigger GUI, Ben/Valery will implement it
2. Streaming DAQ progress
- still need to fix VTP TCP/IP issues (Ben)
- reconstruction algorithms to be considered for online data processing: offline code, level1 code, ...; can be tested as 'level3' in current DAQ
- will investigate different aspects: DAQ (ben,sergey), reconstruction (sergey,gagik), physics motivation/needs (vpk,stepan), human abilities to run reconstruction online, etc
- level3 seems good place to investigate possibility to run reconstruction online