January 29, 2020 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
Created page with "present: Sergey Boyarinov, 1. Nuclear target test preparations 2. BONUS run preparations 3. Streaming DAQ test during nuclear target test" |
No edit summary |
||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
present: Sergey Boyarinov, | present: Sergey Boyarinov, Eugene Pasyuk, Rafo, Ben Raydo, vpk, Stepan | ||
1. Nuclear target test preparations | 1. Nuclear target test preparations | ||
2. BONUS run preparations | * Valery prepared trigger files, same as RG-F | ||
* PROD66_noFT_noMM_noBAND will be used | |||
* data to RG-E silo directory | |||
* starts Friday night | |||
* may end Wednesday morning, or goto Friday morning | |||
2. BONUS run preparations (RG-F) | |||
* Valery prepared trigger files, will archive after fixing date preservation | |||
* new MM readout will be tested in EEL, Irakli should be here | |||
* February 12 is start date, will talk again later with BONUS team | |||
3. Streaming DAQ test during nuclear target test | 3. Streaming DAQ test during nuclear target test | ||
* in progress, mostly work but still have stuff to fix | |||
* will run in parallel with item 1 | |||
* may have only 4 nights to run | |||
* will write file instead of tridas if have to | |||
4. Slow control: beam monitor is operational based on classc10 | |||
5. File server switch pushed to May | |||
6. RICH HV board shows problems, may replace it |
Latest revision as of 10:41, 29 January 2020
present: Sergey Boyarinov, Eugene Pasyuk, Rafo, Ben Raydo, vpk, Stepan
1. Nuclear target test preparations
- Valery prepared trigger files, same as RG-F
- PROD66_noFT_noMM_noBAND will be used
- data to RG-E silo directory
- starts Friday night
- may end Wednesday morning, or goto Friday morning
2. BONUS run preparations (RG-F)
- Valery prepared trigger files, will archive after fixing date preservation
- new MM readout will be tested in EEL, Irakli should be here
- February 12 is start date, will talk again later with BONUS team
3. Streaming DAQ test during nuclear target test
- in progress, mostly work but still have stuff to fix
- will run in parallel with item 1
- may have only 4 nights to run
- will write file instead of tridas if have to
4. Slow control: beam monitor is operational based on classc10
5. File server switch pushed to May
6. RICH HV board shows problems, may replace it