November 27, 2019 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 17: | Line 17: | ||
* DONE make TI master recognizable (by extra words ?), need it to compensate for timestamp difference between TI master and the rest of crates - Sergey | * DONE make TI master recognizable (by extra words ?), need it to compensate for timestamp difference between TI master and the rest of crates - Sergey | ||
* tape directory rg-b | * tape directory rg-b, Sergey will check move2silo |
Latest revision as of 10:28, 27 November 2019
present: Sergey Boyarinov, Raffaella, Rafo, Ben, vpk, pasyuk, Nathan, Stepan
- helicity flip rate will be 120Hz, 90us t-settle (dead time during flip); Sergey isl working to improve online correction procedure
- RF board not reset every run, Sergey will apply fix
- beam structure control is in progress of designing: will put one dsc2 and one tdc1190 into VME crate on pie tower, put CPU in and start writing software
- NEED to cleanup pie tower table (and crates)
- run start time and end time have to be on 'GO' and on 'End' or whatever
- trigger will be modified - Valery; Silvia generated new dc roads, Ben recompiling firmware; will run random trigger validation
- enforce comment gui to be in center and on top
- DONE make TI master recognizable (by extra words ?), need it to compensate for timestamp difference between TI master and the rest of crates - Sergey
- tape directory rg-b, Sergey will check move2silo