present: Sergey Boyarinov, Ben Raydo
present: Sergey Boyarinov, Ben Raydo, vpk, stepan, nathan
 


1. HPS status
1. HPS status


* HPS finally started production, running around 11kHz and 150MB/s with 160nA current, rate may go up but not significantly which will be easy for DAQ; SVT part seems stable after a lot of work conducted during last few weeks by SLAC teem; rcdb was deployed last night, now all components are in place
* HPS finally started production, running around 12kHz and 110MB/s with 160nA current, rate may go up but not significantly which will be easy for DAQ; SVT part seems stable after a lot of work conducted during last few weeks by SLAC teem; rcdb was deployed last night, now all components are in place


* more trigger studies can be conducted, beam current will be increased factor 2 so we need to optimize trigger to stay within about 30kHz event rate; random trigger run will betaken and studies conducted, in a meanwhile will used current trigger (single positron)
* more trigger studies can be conducted, beam current will be increased factor 2 so we need to optimize trigger to stay within about 30kHz event rate; random trigger run will betaken and studies conducted, in a meanwhile will used current trigger (single positron)
* target beam current is 300nA, will try to do it soon
* online reconstruction will be deployed




2. Purchase requisitions
2. Purchase requisitions
* 5 40G PCI cards for servers - received


* 10 displays - ordered
* 10 displays - ordered

Latest revision as of 10:52, 24 July 2019

present: Sergey Boyarinov, Ben Raydo, vpk, stepan, nathan


1. HPS status

  • HPS finally started production, running around 12kHz and 110MB/s with 160nA current, rate may go up but not significantly which will be easy for DAQ; SVT part seems stable after a lot of work conducted during last few weeks by SLAC teem; rcdb was deployed last night, now all components are in place
  • more trigger studies can be conducted, beam current will be increased factor 2 so we need to optimize trigger to stay within about 30kHz event rate; random trigger run will betaken and studies conducted, in a meanwhile will used current trigger (single positron)
  • target beam current is 300nA, will try to do it soon
  • online reconstruction will be deployed


2. Purchase requisitions

  • 5 40G PCI cards for servers - received
  • 10 displays - ordered
  • 5 desktops (1 installed) - ordered
  • TVs - ordered
  • VXS supply and fan tray - waiting on Volker
  • VME CPU - signed by Volker, waiting for finance
  • VME 10G - ordered one, will test and order more
  • file server - not tested yet
  • curved monitors - not ordered