July 18, 2018 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
No edit summary |
No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
1. DAQ/Trigger upgrades progress for upcoming run | 1. DAQ/Trigger upgrades progress for upcoming run | ||
* FADC firmware: still in Ed hands, Hai is done, will go to Ben tomorrow, he will implement Hall B part (trigger integration chain and timing sync); busy should be implemented as well | * FADC firmware: still in Ed hands, Hai is done, will go to Ben tomorrow, he will implement Hall B part (trigger integration chain and timing sync); busy should be implemented as well; Sergey will send email to detectors groups with related details if anything changed in windows etc | ||
* VTPs and DC trigger: Firmware is ready for current dictionary (incomplete), geometry match is not there yet; VTP event building and readout in progress, crashes seems fixed, slow readout will be addressed after DMA implemented (Bryan Moffit is working on DMA); remaining 5 VTPs should be repaired next week | * VTPs and DC trigger: Firmware is ready for current dictionary (incomplete), geometry match is not there yet; VTP event building and readout in progress, crashes seems fixed, slow readout will be addressed after DMA implemented (Bryan Moffit is working on DMA); remaining 5 VTPs should be repaired next week | ||
* spare pool PRs: all PRs are there except 3 SD and 3 FADC to be done by Chris; BAND situation to be resolved, backup plan for August is VME crate from existing inventory and few FDCs with SDC board, or use few slots in adcctof1 or adccnd1 crates; when VXS crates are here (min 4 month) Chris can give 16 FADCs and final setup will be assembled | * spare pool PRs: all PRs are there except 3 SD and 3 FADC to be done by Chris; BAND situation to be resolved, backup plan for August is VME crate from existing inventory and few FDCs with SDC board, or use few slots in adcctof1 or adccnd1 crates; when VXS crates are here (min 4 month) Chris can give 16 FADCs and final setup will be assembled | ||
* restore counting room computing and svt3 setup in EEL |
Latest revision as of 09:44, 18 July 2018
present: Sergey Boyarinov, Chris Cuevas, Ed, Graham, William, Ben, Hai, Stepan
1. DAQ/Trigger upgrades progress for upcoming run
- FADC firmware: still in Ed hands, Hai is done, will go to Ben tomorrow, he will implement Hall B part (trigger integration chain and timing sync); busy should be implemented as well; Sergey will send email to detectors groups with related details if anything changed in windows etc
- VTPs and DC trigger: Firmware is ready for current dictionary (incomplete), geometry match is not there yet; VTP event building and readout in progress, crashes seems fixed, slow readout will be addressed after DMA implemented (Bryan Moffit is working on DMA); remaining 5 VTPs should be repaired next week
- spare pool PRs: all PRs are there except 3 SD and 3 FADC to be done by Chris; BAND situation to be resolved, backup plan for August is VME crate from existing inventory and few FDCs with SDC board, or use few slots in adcctof1 or adccnd1 crates; when VXS crates are here (min 4 month) Chris can give 16 FADCs and final setup will be assembled
- restore counting room computing and svt3 setup in EEL