July 18, 2018 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
Boiarino (talk | contribs)
Created page with "present: Sergey Boyarinov, Chris Cuevas, Ed, Graham, William, Ben, Hai, Stepan 1. DAQ/Trigger upgrades progress for upcoming run * FADC firmware: still in Ed hands, Hai is d..."
 
Boiarino (talk | contribs)
No edit summary
 
(2 intermediate revisions by the same user not shown)
Line 3: Line 3:
1. DAQ/Trigger upgrades progress for upcoming run
1. DAQ/Trigger upgrades progress for upcoming run


* FADC firmware: still in Ed hands, Hai is done, will go to Ben tomorrow, he will implement Hall B part (trigger integration chain and timing sync); busy should be implemented as well
* FADC firmware: still in Ed hands, Hai is done, will go to Ben tomorrow, he will implement Hall B part (trigger integration chain and timing sync); busy should be implemented as well; Sergey will send email to detectors groups with related details if anything changed in windows etc


* VTPs and DC trigger: Firmware is ready for current dictionary (incomplete), geometry match is not there yet; VTP event building and readout in progress, crashes seems fixed, slow readout will be addressed after DMA implemented (Bryan Moffit is working on DMA); remaining 5 VTPs should be repaired next week
* VTPs and DC trigger: Firmware is ready for current dictionary (incomplete), geometry match is not there yet; VTP event building and readout in progress, crashes seems fixed, slow readout will be addressed after DMA implemented (Bryan Moffit is working on DMA); remaining 5 VTPs should be repaired next week


* spare pool PRs: all PRs are there except 3SD and 3FADC to be done by Chris; BAND situation to be resolved, backup plan for August is VME crate from existing inventory and few FDCs with SDC board, or use few slots in adcctof1 or adccnd1 crates; when VXS crates are here (min 4 month) Chris can give 16 FADCs and final setup will be assembled
* spare pool PRs: all PRs are there except 3 SD and 3 FADC to be done by Chris; BAND situation to be resolved, backup plan for August is VME crate from existing inventory and few FDCs with SDC board, or use few slots in adcctof1 or adccnd1 crates; when VXS crates are here (min 4 month) Chris can give 16 FADCs and final setup will be assembled
 
* restore counting room computing and svt3 setup in EEL

Latest revision as of 09:44, 18 July 2018

present: Sergey Boyarinov, Chris Cuevas, Ed, Graham, William, Ben, Hai, Stepan

1. DAQ/Trigger upgrades progress for upcoming run

  • FADC firmware: still in Ed hands, Hai is done, will go to Ben tomorrow, he will implement Hall B part (trigger integration chain and timing sync); busy should be implemented as well; Sergey will send email to detectors groups with related details if anything changed in windows etc
  • VTPs and DC trigger: Firmware is ready for current dictionary (incomplete), geometry match is not there yet; VTP event building and readout in progress, crashes seems fixed, slow readout will be addressed after DMA implemented (Bryan Moffit is working on DMA); remaining 5 VTPs should be repaired next week
  • spare pool PRs: all PRs are there except 3 SD and 3 FADC to be done by Chris; BAND situation to be resolved, backup plan for August is VME crate from existing inventory and few FDCs with SDC board, or use few slots in adcctof1 or adccnd1 crates; when VXS crates are here (min 4 month) Chris can give 16 FADCs and final setup will be assembled
  • restore counting room computing and svt3 setup in EEL