  1. CLAS12 trigger installation
  1. CLAS12 electronics installation status
 
* VTP boards: 19 boards (6 ecal, 6 cal, 6 region3 dc, 1 trig2) installed (Ben and Sergey) and temporary wired to serial and ethernet, fibers to be installed
 
* terminal servers (Sergey): realport software from Digi installed on clonpc0, 2 etherlite32 terminal servers (etherlite14 and etherlite15) installed on subway, all 9 servers (6 forward carriage, 1 pie tower, 2 subway) configured with bandwidth upto 115200
 
* subway electronics completely installed: DCRB and SD boards (Fast Electronics Group), CPUs (Sergey), Tis (William and Sergey), some temporary wired to serial and ethernet for preliminary testing, all devices registered in JNET, ready for permanent wiring to serial, ethernet and fibers

Latest revision as of 08:51, 31 August 2016

Clas On-line Meeting, Wednesday, August 31 at 10am in Room B101


1. CLAS12 electronics installation status