December 19, 2012 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
Created page with "present: Sergey Boyarinov 1.CLAS12 Installation * all VME and VSX crates received and installed, some work remains on FC before board installation can be started * SVT test se..." |
No edit summary |
||
Line 1: | Line 1: | ||
present: Sergey Boyarinov | present: Sergey Boyarinov, Eugene Pasyuk | ||
1.CLAS12 Installation | 1.CLAS12 Installation | ||
* all VME and VSX crates received and installed, some work remains on FC before board installation can be started | * all VME (16) and VSX (22) crates received and installed, some work remains on FC before board installation can be started | ||
* will buy 5 SY4527 HV mainframes | |||
* AC power still due | |||
* SVT test setup need some software work (Sergey B.) | * SVT test setup need some software work (Sergey B.) | ||
* 5000 item barcode labels and 20000 cable barcode label pairs has been ordered | * 5000 item barcode labels and 20000 cable barcode label pairs has been ordered; 'human-readable' labels to be ordered | ||
* DCRB crate should be ready for testing in few days (Ben) | |||
* George Jacobs will prepare label list for DC cables |
Latest revision as of 10:10, 19 December 2012
present: Sergey Boyarinov, Eugene Pasyuk
1.CLAS12 Installation
- all VME (16) and VSX (22) crates received and installed, some work remains on FC before board installation can be started
- will buy 5 SY4527 HV mainframes
- AC power still due
- SVT test setup need some software work (Sergey B.)
- 5000 item barcode labels and 20000 cable barcode label pairs has been ordered; 'human-readable' labels to be ordered
- DCRB crate should be ready for testing in few days (Ben)
- George Jacobs will prepare label list for DC cables