December 19, 2012 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
Created page with "present: Sergey Boyarinov 1.CLAS12 Installation * all VME and VSX crates received and installed, some work remains on FC before board installation can be started * SVT test se..."
 
No edit summary
 
Line 1: Line 1:
present: Sergey Boyarinov
present: Sergey Boyarinov, Eugene Pasyuk


1.CLAS12 Installation
1.CLAS12 Installation


* all VME and VSX crates received and installed, some work remains on FC before board installation can be started
* all VME (16)  and VSX (22) crates received and installed, some work remains on FC before board installation can be started
 
* will buy 5 SY4527 HV mainframes
 
* AC power still due


* SVT test setup need some software work (Sergey B.)
* SVT test setup need some software work (Sergey B.)


* 5000 item barcode labels and 20000 cable barcode label pairs has been ordered
* 5000 item barcode labels and 20000 cable barcode label pairs has been ordered; 'human-readable' labels to be ordered
 
* DCRB crate should be ready for testing in few days (Ben)
 
* George Jacobs will prepare label list for DC cables

Latest revision as of 10:10, 19 December 2012

present: Sergey Boyarinov, Eugene Pasyuk

1.CLAS12 Installation

  • all VME (16) and VSX (22) crates received and installed, some work remains on FC before board installation can be started
  • will buy 5 SY4527 HV mainframes
  • AC power still due
  • SVT test setup need some software work (Sergey B.)
  • 5000 item barcode labels and 20000 cable barcode label pairs has been ordered; 'human-readable' labels to be ordered
  • DCRB crate should be ready for testing in few days (Ben)
  • George Jacobs will prepare label list for DC cables