April 4, 2012 online meeting minutes: Difference between revisions
Created page with "present: Sergey Boyarinov, Sergey Pozdnyakov, Eugene Pasyuk, FX, Stepan Stepanyan 1 HPS: trigger development under way, simulation is running, after that lab test will be conduc..." |
No edit summary |
||
(One intermediate revision by the same user not shown) | |||
Line 3: | Line 3: | ||
1 HPS: trigger development under way, simulation is running, after that lab test will be conducted, hope to finish by next week; calorimeter will be installed today (hopefully), then electronics will be installed whenever ready; hope to cable everything today/tomorrow (adc's - next week); we will use new wiring map used by trigger algorithm, will cable accordingly; Sergey B. will try to modify existing IC scaler root GUI, taking counts from jlab discriminators; will talk to Ben about trigger options, in particular we'll need single cluster mode for debugging; SVT equipment and people are coming on April 12, will assemble and test in clean room, DAQ should be there by April 16, Sergey will request 86 subnet there | 1 HPS: trigger development under way, simulation is running, after that lab test will be conducted, hope to finish by next week; calorimeter will be installed today (hopefully), then electronics will be installed whenever ready; hope to cable everything today/tomorrow (adc's - next week); we will use new wiring map used by trigger algorithm, will cable accordingly; Sergey B. will try to modify existing IC scaler root GUI, taking counts from jlab discriminators; will talk to Ben about trigger options, in particular we'll need single cluster mode for debugging; SVT equipment and people are coming on April 12, will assemble and test in clean room, DAQ should be there by April 16, Sergey will request 86 subnet there | ||
2. JInventory: Elliott's version of our php scripts is installed and seems running fine; Sergey B is working on cables in database; will search for two devices: labeler with barcode with number printed and mysql access, and barcode reader with mysql access and information displayed on and controlled from the reader (Android ?) | 2. JInventory: Elliott's version of our php scripts is installed and seems running fine; Sergey B is working on cables in database; will search for two devices: labeler with barcode with number AND label name printed and mysql access and small enough to fit boards and cables, and barcode reader with mysql access and information displayed on and controlled from the reader (Android ?) |
Latest revision as of 10:04, 4 April 2012
present: Sergey Boyarinov, Sergey Pozdnyakov, Eugene Pasyuk, FX, Stepan Stepanyan
1 HPS: trigger development under way, simulation is running, after that lab test will be conducted, hope to finish by next week; calorimeter will be installed today (hopefully), then electronics will be installed whenever ready; hope to cable everything today/tomorrow (adc's - next week); we will use new wiring map used by trigger algorithm, will cable accordingly; Sergey B. will try to modify existing IC scaler root GUI, taking counts from jlab discriminators; will talk to Ben about trigger options, in particular we'll need single cluster mode for debugging; SVT equipment and people are coming on April 12, will assemble and test in clean room, DAQ should be there by April 16, Sergey will request 86 subnet there
2. JInventory: Elliott's version of our php scripts is installed and seems running fine; Sergey B is working on cables in database; will search for two devices: labeler with barcode with number AND label name printed and mysql access and small enough to fit boards and cables, and barcode reader with mysql access and information displayed on and controlled from the reader (Android ?)