Created page with "present: Sergey Boyarinov, Sergey Pozdnyakov, Eugene Pasyuk 1. FADC250: baseline stability was measured during 2.5 days, processing right now; base line calibration dependencies..." |
No edit summary |
||
Line 1: | Line 1: | ||
present: Sergey Boyarinov, Sergey Pozdnyakov, Eugene Pasyuk | present: Sergey Boyarinov, Sergey Pozdnyakov, Eugene Pasyuk, FX | ||
1. FADC250: baseline stability was measured during 2.5 days, processing right now; base line calibration dependencies were studied, on first glance all dependencies are similar: linear and the same range: 550 in DAC registed gives about 4000, and 3500 gives about 0, plus/minus 100 | 1. FADC250: baseline stability was measured during 2.5 days, processing right now; base line calibration dependencies were studied, on first glance all dependencies are similar: linear and the same range: 550 in DAC registed gives about 4000, and 3500 gives about 0, plus/minus 100; will contunie testing following plan discussed on previous meeting | ||
2. PCAL trigger: | 2. PCAL trigger: almost finished, Sergey B. presented working GUI, some more work is needed, estimated time 1 week |
Latest revision as of 09:32, 21 September 2011
present: Sergey Boyarinov, Sergey Pozdnyakov, Eugene Pasyuk, FX
1. FADC250: baseline stability was measured during 2.5 days, processing right now; base line calibration dependencies were studied, on first glance all dependencies are similar: linear and the same range: 550 in DAC registed gives about 4000, and 3500 gives about 0, plus/minus 100; will contunie testing following plan discussed on previous meeting
2. PCAL trigger: almost finished, Sergey B. presented working GUI, some more work is needed, estimated time 1 week