September 21, 2011 online meeting minutes: Difference between revisions
Jump to navigation
Jump to search
Created page with "present: Sergey Boyarinov, Sergey Pozdnyakov, Eugene Pasyuk 1. FADC250: baseline stability was measured during 2.5 days, processing right now; base line calibration dependencies..." |
(No difference)
|
Revision as of 10:14, 21 September 2011
present: Sergey Boyarinov, Sergey Pozdnyakov, Eugene Pasyuk
1. FADC250: baseline stability was measured during 2.5 days, processing right now; base line calibration dependencies were studied, on first glance all dependencies are similar: linear and the same range: 550 in DAC registed gives about 4000, and 3500 gives about 0, plus/minus 100
2. PCAL trigger: