January 12, 2011 online meeting minutes: Difference between revisions

From CLONWiki
Jump to navigation Jump to search
No edit summary
No edit summary
 
Line 13: Line 13:
* LAC need to be included
* LAC need to be included


2. CAEN HV testing:
* EC epics scalers problem (showing zero) was reported, will investigate
 
2. CAEN HV testing: latest set on 14 A1535 HV boards received from CAEN shows big failure rate (8 boards with problems), send them back to CAEN; testing mainframe has some problems as well, CAEN expert will be here in February-March, calibration board will be delivered so single channel repair can be done onsite

Latest revision as of 11:03, 12 January 2011

present: Sergey Boyarinov, Nerses, Sergey Boyarinov, Eugene Pasyuk

1. TPE run status:

  • trigger was modified (bit8: TOFP2 in opposite sectors, bit12: EC only), more changes are needed to include L2 for bit 8; probably Chris have to try to turn off back part in Level2
  • clasweb was replaced by new machine under RHEL5; problem was reported today about run database access
  • HV alarms: warning for BART-MEASURED comparision; we have an ERROR on SET-MEASURED right now; check if channel is enabled, if disabled the alarm should not be generated

INFO: IOC has measured, demand, input; MAINFRAME has measured, set; when type value in IOC input, it goes to IOC demand and to MAINFRAME set; or not ??? Nerses will investigate; possible improvement is to make WARNING alarm between BART and MAINFRAME measured

  • LAC need to be included
  • EC epics scalers problem (showing zero) was reported, will investigate

2. CAEN HV testing: latest set on 14 A1535 HV boards received from CAEN shows big failure rate (8 boards with problems), send them back to CAEN; testing mainframe has some problems as well, CAEN expert will be here in February-March, calibration board will be delivered so single channel repair can be done onsite